Text
-
r e
., 3 o[? -
'j EAR s' 1375 l
l~
Docket tios.: 50-269 ('
- h
~ and 50-287
.50-270 1
y
- Daniel R. P.uller, Assistant Director for Environmental Projects,'RL THRU
- - Gordon :r.. Dicker, Chief. Environmental Projects Branch 2. RL 1
OCO:iEE fiUCLEAR STATIO:1 Uti!TS 1,' 2, NiD 3 VISITATION This visit to tne Oconee Nuclear Station was made primarily to review
.the procedures being used by the utility to implement the existing Appendix B of the Technical Specifications.
A list of utility personnel contacted and staff representatives making visitation is enclosed.
f The.11cansce's; progra.n is itemized as follows:
- 1. -Each week on Thursday visual inspections are performed from the intake structure in an attempt to identify species, count numbers and estimate length of impinged fish.
This method appears to be of limited value from a practical. point-of-vied since observations are difficult to make and accuracy of assessment is questionable.
2.
Six selected intake screens are pulled every two weeks on Thursday to count the nunbars of impinged fish and identify species and size I
of fish. Reports are made to the appropriate governmental agencies j-uoth. state and Fedaral as required by the Technical Specifications.
The intake scri:en removal process was observed by the NRC repre-i l-l sentatives of several sample screens.
i n
3.
Since r.ay 1974, fisn impingement and entrapment data have been sent to EPA in connection with evaluation for the Section 316a and-3160 exemptions, and evaluation will be completed by mid-May 1975.
Tne licensee is expected to suomit a Technical Specification change proposal after completion of the EPA requirements.
The utility advised that tho' threadfin shad had been stocked by the -
South Carolina-Wildlife and F.arine' Resources Department, and this. fish
^
species is' not indigenous to this area.
m Tue staff requested the licensca to provide'CCW pump operating data in an' attempt to correlate the fish impingement data for January and February 1975 with pump operations during the same period.
The utility agreed to provide these data for_ this analysis.
The staff will make an independent assessment as to the significance of the fisr, impinue- /gIC[)
- ment problem and will. develop more realistic requira, ente to amend the p
om...
enva k (
ac.m <m
$m acu==
- o...................o,,............
- 8001020 M [
~
Daniel R. Muller 2'
y3g,
1975 4
Tecnnical Specifications.
In addition,- the staff inquired about the status of the interim t
Radwaste System and its perfonnance. We were advised that the interim system was not operational yet and the interim Radwaste System j
will be shown' in the July-December 1974 semiannual report to be sent out February 28,1975 The utility advised that the permanent Radwaste System dasign is scheduled for submittal to NRC by August 1975.
l'iark u Environnental Projects Branch 2 Division of Reactor Licensing I
Enclosure:
l Listof Participants DIST i
i DOCKETFILES[
}
NRR Reading EP-2 Reading Giambusso l
Au 1
Dicker Kreutzer Muller OGC Denton1 l
I&E(2)
Sheppard McDonough
.McWherter i
l l'
1 l
t i
i t
_ELIEP-2 ar ic=
- AU/rw jp)$
+
e..m.,
i
-j uc J.
.ar= *. 3/3/75-
- u. s. oovannment ensurine orrics: sera.ese. nee
- _ Form Aac.)l3 (Rev.9-53) AEOd 0240 -
i y
. UAR. 3 - 1975 gi:n
^* '
'OC0:4EE-NUCLEAR' STATION VISITATION.
February 27,.1975
' List of Participants 9:
U.S.N.R.C.
. John Bolen,' Environmental Specialist, ESB M. L. Au, Environmental Project Manager, EPB-2
-Duke Power Company D. C. Holt, System' Engineer, Licensing.
.J. J. Sevic, Biologists, 0conee
.T. W.-Yocum,-Ecologists
-f i
~
l 1
l
-t
,L'
'., 6
\\