MAY 151967 A. Giambusso, Assistaat Director for Project Management Division of Rasctor Development & Techno Charles G. Long, Chief Y
Reactor Project Branch No. 3, Nng sgoed c Lod Chades NEW OCONEE NUCLEAR STATION UNIT 3 APPLICATION CONTAINED IN E:NDENT NO. 3 TD DUKE F0WER COMPANT APPLICATION, DOCKET NOS. 50-269, 50-270 AND 50-287 Y
A copy of Am== h t No. 3 dated April 29, 1967 to Duka Power Company's application is attached for your use.
Please note that A=*=ht No. 3 include a saw application for a third i
pressurized water nuclear reactor to be kaeum as "Ocomes Nur1 mar Station, Unit 3."
This new reactor f=r414ty is to be constructed adjacent to Unit Nos.1 med 2 at the Company's Oconee site in eastern Oconee County, approximately eight miles northeast of Seneca, South Carolina. The new Oconee Station Unit No. 3 is scheduled for completion between November 1, 1972 and August 1, 1973. The applicant estimates that the total cost of the Oconee Nuclear Station, Units 1, 2 and 3 including the initial core for each unit will be approximately $340,850,000. The addition of Unit 3 will bring the total capacity developed at the Oconee site to 2622 megawatta (electrical).
Flease review he No. 3 and provide Mr. Lovejoy, Of'ica of the Controller, with your comments as to the reasonabletssa of the sp-4=1 m 1= e material requirements for the first core of this new reactor.
Atem-h===t:
Amendment No. 3 dated 4/29/67 cc: -Mr. C. A. Lovejoy, OC Distribution:
Suppl. (3X DRL Reading RPB'#3 Reading Orig: _FWKaras R. S. Boyd T. F. Engelhardt, OGC C. G. Long RPB #3-DRL RPB #3-DRL omcr >
f MW.
'i;.
sunnAug >
aras/_lJi -
CGLon3
^
5'l1'67 DATE >
b"b"b7 WWzn AEC 318 (Rev.943)