ML19319A634
| ML19319A634 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/16/1968 |
| From: | Long F US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319A635 | List: |
| References | |
| NUDOCS 7911180071 | |
| Download: ML19319A634 (1) | |
Text
T g-1 I
d'bke,,
UNITED STATCS e e[ Ch{~)$
ATOMIC ENERGY COMMISSION
}
O!VislON CF COMPLIANCC 4 };
=
ih!G IC N ll - $UIT E G18 g
2 ? $ Pi* A C H T h F C ST F1 F E T, t4 07 T H A E S T yg,,,,,.. t 4 517 p
A T t A f.T A, CL G alA 2!. :,0 3 N'd j 6 *d a C p t,y p r.s' t M T O EDT 1G 1960 J. P. O'Reilly, Chief, Reactor
{
Inspection and Enforcement Branch Division of Compliance, Headquarters DUKE F0WER COMPANY (OCO:EM 1, 2, 3) LICENSE I:0S. CPPR-33, 3'4, 35 DOCIET HOS. 50-269, 270, 287 l
Transmitted herewith for infornation is Ccmpliance Report a..w No. 269, 270, 287/68-4 covering the routino inspection of Septe er 25-27, 1968.
One item of nonconformance with a construction specification was noted.
There were no safety problems identified.
Please note that containment building liner plate penetration i
sectio'ns were raccived on-site f; m Southern Boiler Shop with t
telding defects.
These defects v.ere found by the licensee's own inspection personnel.
We believe that adequate corrective measures are being taken by the ]i'.ensee; however, we plc.n a separato visit to the Southe 70'ler Shop to see f3 cat hand what quality control proced are in effect.
W3. !" 4+7 r.
J ang 0
Seni_or Reactor Inspector CO:II:FJL
Enclosure:
CO Rpt No. 269, 270, 287/68-4 (Seidle) cc:
E. G. Case, DRS R. S. Boyd, DRL {2) c_-
S. Levine, DBL (b)
$ in ij U
a r-D. J. Skovholt, DRL (3)
L. Korn'olith, Jr., C0 f*"m
-?
A R. W. Kirkcan, 00:I
[
'd B
B. H. Grier, CO:III y
'-?
D. I. Walker, 00:IV g
j
,j e_J i:
o R. W. Smit ( Mf0:V G 'd REG File N
.3 I
2 a f,
Q :3 C3
~
p,,
- 191118007/
cp
..s' t
_