Text
_ _ _ _ _ _ _ _ _ _ _
MAR 7 1938 k
MEMORANDUM FOR:
Jack Rce, Director Divisicn of Licensee Ferformance ano Quality Evaluation Office of Nuclear Reactor Regulation FROM:
Brian W. Sheron, Director Division of Reactor and Plant Systems Office of Nuclear Regulatory Research
SUBJECT:
CLOSURE OF GENERIC ISSUE I.D.4 "CONTROL ROOM DESIGN STANDARD" Responsibility for Generic Issue I.D.4, "Control Rooni Design Standard," was transferred from the Office of Nuclear Reactor Reculation to the Office of I uclear Regulatory Research (RES) by an /pril 10,'1987 memorandum from W. Russell to T. Speis.
RES review indicates that all operating plants and plants under construction are undergoing detailed control room design reviews against standards acceptable to the NRC. Accordingly, we have prepared a memorandum closing Generic Issue I.D.4 (see Enclosure).
Please note that, in response to the November 9,1987 request from T. Murley to E. Beckjord, design standards for advanced control rctms will be addressed as a research issue under the newly established Human Factors Research Program.
Closure of Generic Issue I.D.4 was discussed with W. Regan and D. Eckenrode of your Division, and they voiced no concerns.
However, we invite your formal comments on closure of this issue.
If we do not hear from you within one week of the date of this memorandum, we will assume you agree with this epproach and will proceed with efforts to close the issue.
8809220038 880307 RES SUBJ R2000.02 Brian W. Sheron, Director Division of PNU Reactor end Plant Systems Office of Nuclear Regulatory Research
Enclosure:
DISTRIBUTION:
As stated DCS RES Circ/Chron cc:
F. Gillespie A. Rubin DRPS Chron T. Speis D. Serig RHFB Rdg.
W. Minners W. Regan EBeckjord 0FM F. Coffman R. Eckenrode BSheron I(
Contact:
Dennis Serig (RES/DRPS/REFC) x23552
- See previous concurrence k:R 6 RHFB:DRPS RHFB:DRPS RHFB:DRPS DD:Dra)5 D: 1'.
- DSerig/ng
- ARubin
- FCoffman
- WMinners BSb on D
s TS 'is 3/ /88 3/ /88 3/ /88 3/ /88 3/}/88
/
(8 RE.S EB kjord 3/
'8
/
"0FFICIAL PECORD COPY" i
i
)
c
\\
MEMORANDUM FOR: Jack Roe, Director Division of Licensee Performance
}q and Quality Evaluation Office of Nuclear Reactor Eegulation s
\\
FROM:
\\
Brian W. Sheron, Director N
Division of Reactor and Plant Systems i
\\
Office of Nuclear Regulatory Research
SUBJECT:
CLOSURE OF GENERIC ISSUE I.D.4 "CONTROL ROOM DESIGN STANDARD" N
\\
Responsibility for G$neric Issue I.D.4, "Control Room Design Standard," was transferred from the Office of Nuclear Reactor Regulation to the Office of i
Nuclear Regulatory Rese'arch 10, 1987 memorandum from i
W. Russell to T. Speis. \\ (RES) by an April RES review indicates that d 1 operating plants and plants under construction K
j are undergoing detailed contrpi room design reviews against standards i
acceptable to the NRC. Accordingly, we have prepared a memorandum closing i
GenericIssueI.D.4(seeEnclosKre).
Please note that, in response to the November 9,1987 request from T. flurley to E. Beckjord, design standards for advanced control rooms will be add essed as a research issue under the newly established Human Factors Research((rogram.
l Closure of Generic Issue I.D.4 was d\\scussed with W. Fecan and D. Eckenrode of your Division, and they voiced no concernt. However, we invite your formal comments on closure of this issue.
If he do not receive such comments within one week of the date of this memorandum,\\we will assume there are none and i
will proceed with efforts to close the issue.
)
\\
\\
\\
BriangW. Sheron, Director Division of l
Reactor and Plant Systems Office of NucleakRegulatory Research I
Enclosure:
DISTRIBUi10N:
As stated C05 i
RES Circ/Chron cc:
F. Gillespie A. Rubin DRPSChron\\
T. Speis D. Serig RHFB Rdg.
g W. Minners W. Regan EBeckjord
\\
F. Coffman R. Eckenrode BSheron
Contact:
Dennis Serig (RES/DRPS/RHFB) x x23552
- See previous ccncurrence
\\
t RHFB:DRPS RHFB:DRPS RHFB:DRPS D04 AP D:DRPS ' DD:RES DD:RES
- DSerig/ng
- ARubin
- FCoffman dWnners BSheron \\DRoss TSpeis 3/ /88 3/ /88 3/ /88 3/ /88 3/ /88 3{ /88 3/ /88 D:RES
\\
EBeckjord
\\
3/ /88 s
"0FFICIAL RECORD COPY"
a.
s.
l MEMORANDUM FOR: Jack Roe, Director a
Division of Licensee Performance and Quality Ev luation Office of Nuclear Reactor Regulation
{
FROM:
Brian W. Sheron, Director.
Division.of Reactor and Plant Systems i
ffice of..Nuclear Regulatory Research i
SUBJECT:
CL SURE OF GENERIC ISSUE I.D.4 "CONTROL
[
R00 DESIGN STANDARD" l
Responsibility for Gene 'c Issue I.D.4, "Control Room Design Standard," was transferred from the Off1 e of Nuclear Reactor Regulation to the'Office of Regulatory Research (RES) an'April 10, 1987, memorandum from W. Russell to T. Speis.
i-RES review indicates that all perating plants and plants under construction are.undergoing detailed contro room design reviews.against standards.
acceptable to the NRC. Accordi ly, we have prepared a memorandum'closing 3
Generic Issue I.D.4 (see enclosu e).
Please note that,-in response to the November 9,1987, request from T. Murley to E. Beckjord, design standards for
~
advanced control rooms will be add essed as a research issue under the newly established Human Factors Research rogram.
i Closure of Generic Issue I.D.4 was di cussed with W. Regan and D. Eckenrode of your Division, and they voiced no conc rns. However, we invite your formal l
comments on closure of this issue.
If do not receive such comments within i
one week of the date of this memorandum, e will assume there are none and will proceed with efforts to close the is e.
2 I
I Brian Sheron, Director DivisiokofReactorandPlantSystems l
4 Office of Nuclear Regulatory Research j
l
Enclosure:
DISTRIBUTI As stated DCS RES Circ/Chro
.J 4
cc:
F. Gillespie A. Rubin DRPS Chron 1
T. Speis D. Serig RHFB Rdg.
W. Minners W. Regan EBeckjord F. Coffman R. Eckenrode BSheron
Contact:
Dennis Serig (RES/DRPS/RHFB)
=
x23552 4
Gsf f Fc RHFB:DRPS RHFB:DRPS RHFB:DRPS DD:DRPS D:DRPS DD: ES DDiRES i
i DSerig/ng 6 ARubin W FCoffman WMinners BSheron DRos TSpeis 3/ % /88 3/2 /88 3/2/88-3/ /88 3/ /88 3/ /
3/ 188 i
D:RES EBeckjord I
3/ /88 "0FFICIAL RECORD COPY" c
l
~
j
(
,[pm na%A UNITED STATES Enclosure y
)5 (
g NUCLEAR REGULATORY COMMISSION 5
4j WASHINGTON,0. C. 20555 M,o
.] 9 Pp'
- W$iWk, MEMORANDUM FOR:
Victor Stello, Jr., Executive Director for Operations FROM:
Eric S. Beckford, Director Office of Nuclear Regulatory Researct, i
SUBJECT:
CLOSURE OF GENERIC ISSUE I.D.4 "CONTROL ROOM DESIGN STANDARD" l
Generic Issue I.D.4, "Control Room Design Standard," is a Three Mile Island (TMI) Task Action Plan (TAP) item. NUREG-0660 stated that the issue would be resolved by NRC issuance of a
"...regulatory guide based on an evaluation of industry standards
[IEEE 566 and 567] that includes consideration of the applicability i
of these standards to plants under construction...."
Prompt revision of IEEE 566 and 567 was to be urged, and compliance with the regulatory guide was to be required as necessary.
Publication of the i
regulatory guide was ori The Office of Nuclear Reactor Regulation (NRR)ginally scheduled for May 1982.
was to ensure compliance or commitment to comply by May 1983.
Responsibility for Generic Issue I.D.4 was transferred from NRR to the Office of Fegulatory Research (RES) by an April 10, 1987, memorandum frem
- k. Russell to T. Speis, RES review of the status of Generic Issue I.D.4 l
indicates the following:
1.
The Institute of Electrical and Electronics Engineers, Inc. (IEEE) published IEEE Standard (Std) 566, "IEEE Recommended Practice for i
the Design of Display and Control Facilities for Central Control Rooms of Nuclear Power Generating Stations, "in 1977. However, IEEE Std 566 was subsequently withdrawn.
2.
IEEE PIO23, "IEEE Guide for the Application of Human Factors Engineering to Systems, Equipment, and Facilities of Nuclear Power Generating Stations," will supplant IEEE Std 566.
P1023 is a 3
broader document than IEEE Std 566.
It addresses the process of human factors engineering and the issues to be'addressed by that process. As described, the process is applicable not only to the i
control room but to the entire plant.
P1023 does not provide the detailed design criteria which are commonly found in human factors engineering standards.
PIO23 is nearing final IEEE approval.
3.
ANSI/IEEE Std 567, "IEEE Trial-Use Standard Criteria for the Design 3
of the Control Room Complex for a Nuclear Power Generating Station" is under revision.
Final approval is not expected until late 1989 at the earliest.
e-,
E m
-n-m.----v-,-.
y m---
e,
.---n-
i 4.
There has been no NRC action aimed directly at' resolving Generic -
j Issue I.D.4 since publication of NUREG-0660 (May 1980). However, i
the NRC has reviewed and commented en drafts of IEEE P1023 and is-expected to review and comment on drafts revisions of IEEE Std 567.
j 5.
Although no action was taken on Generic Issue I.D.4, all commercial-
'I nuclear power plants in the United~ States, whether operational or i
i under construction, are being subjected to a Detailed Control Room
'l Design Review (DCRDR)'in response to Till TAP I.D.I.
"Guidelines for Control Room Design Reviews" and acceptable substitutes (e.g., the Boiling Water Reactor. 0wner's Group "Control l
[
Room Survey Program" and "Checklist Supplement") areL being used as i
control room design standards.
6.
All future applications for light water reactors shall include, per 10 CFR 50.34(g), an evaluation of the proposed facility against the Standard Review Plan (the 3RP -- HUREG-0800).
SRP section 18.1 addresses control room design and references NUREG-0700 as appropriate guicance for control' room design.
7.
hRR reouested (November 9,1987, memorandum from T. Murley to E. Beckjord) that RES determine the need for control. room design 2
standards for advanced control rooms.
Items E and 6 above indicate that staff action has negated the' reed for evaluation of industry.control room design standards and for development of a -
1 Regulatory Guide endorsing those standards. NUREG-0700 and acceptable 4
substitutes are the de facto control room design standards for evaluating commercial nuclear power plants in the United States.
As the result of the staff action Generic Issue I.D.4 has been resolved and is closed.
Ieformation in the Generic Issue Panagement Control System'will be revised accordingly.
2 Design standards for advanced centrol rooms will be addressed as a research
~
issue under the rewly established Human Factors Research Program.
4 a
Eric S. Beckjord Director Office of Nuclear Regulatory Fesearch cc:
See next page S
,