ML19318D135
| ML19318D135 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/21/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19318D136 | List: |
| References | |
| NUDOCS 8007070394 | |
| Download: ML19318D135 (2) | |
See also: IR 05000348/1980010
Text
.__ _ _ .___.
.
-__
___ ______.
[b
o# Se
j
UNITED STATES
[pYN
s
y
3,
NUCLEAR REGULATORY COMMISSION
8
E
'E
REGION il
gg
<
o
101 MARIETTA ST,. N.W., SulTE 3100
ATLANTA, GEORGIA 30303
In Reply Refer Tc :
RII:WHB
MAY 2 11980
50-348/80-10
50-364/80-11
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. H. Bradford of this office on
March 31 through April 25, 1980 of activities authorized by NRC License No.
NPF-2 and Construction Permit No. CPPR-86 for the Farley facility, and to the
discussion of our findings held with W. G. Hairston at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
l
Vithin the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the encloseo
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis or which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
-
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
K. c .
.
R. C.
wis, Acting Chief
Reactor Operations and Nuclear -
Support Branch
Enclosures:
Inspection Report Nos. 50-348/80-10
and 50-364/80-11
cc w/ enc 1:
(See Page 2)
800707 0$Tf {
.. -
.
-
- ..
.
Alabama Power Company
-2-
'
B Y 2
t,
,1
cc w/ enc 1:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, AL 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
O. D. Kingsley, Jr.
Manager, Nuclear Engineering and
Technical Services
P. O. Box 2641
Birmingham, AL 35291
J. W. McGowan
Manager-Operations Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
.
yv- et egg - -
- ' * *
gs
p
__
,
'