7Ec
UNITED STATES
- p*cuq'o,
NUCLEAR REGULATORY COMMISSION
.
O
^
REGloN IV
E
o
611 RYAN PLAZA DRIVE, SUITE 1000
%'
Lj
ARLINGTON, TEXAS 76012
%...../
May 23, 1980
In Reply Refer To:
,
'
RIV
Docket No. STN 50-482/Rpt. 80-08
Kansas Gas and Electric Company
ATTN:
Mr. G. L. Koester
Vice President Operations
Post Office Box 208
Wichita, Kansas
67201
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Martin and T. E. Vandel
of our staff during the period April 7-11, and 28-29, 1980, of activities author-
ized by NRC Construction Permit No. CPPR-147 for Wolf Creek, Unit No. 1, and to
the discussion of our findings with Mr. M. E. Clark and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection and cur findings are. discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that cartain of your activities appeared
to deviate from commitments in the FSAR. This item and references to the
specific commitments are identified in the enclosed Notice of Deviation. In
your reply, please include your comments concerning this item, a description
of any steps that have been or will be taken to correct it, a description of
any steps that have been or will be taken to prevent recurrence, and the date
all corrective actions or preventive measures were or will be completed.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If the
]
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
'
of the date of this letter, requesting thac such information be withheld from
,
1
l
3
-
8 007070 8 dS3
__
-
.
,
Kansas Gas and Electric Company
2
May 23, 1980
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information ideatified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/ /
W. C. Seidle, Chief
Reactor Construction and
'
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
IE Inspection Report No. STN 50-482/80-08
-
-
. _ , _
. , -