ML19318C811
| ML19318C811 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/11/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| References | |
| NUDOCS 8007020310 | |
| Download: ML19318C811 (1) | |
Text
UNITED STATES E"
'n NUCLEAR REGULATORY COMMISSION 3
~ I e
REGION 111 f*
799 ROOSEVELT ROAD o
GLEN ELLYN,ILLINolS 60137 June 11, 1980 Docket No. 50-346 Toledo Edison Company ATTN:
Mr. R. P. Crouse Vice President Nuclear Edison Plaza Toledo, OH 43652 Gentlemen:
We have reviewed the proposal in your March 28, 1980, letter (Serial No.
1-123) for meeting the requirements of Section VII.2 of our March 5, 1980, Order to Modify the License.
We find your commitments referenced in your letter to the December 6, 1979, draft of ANS 3.1 acceptable for meeting the requirements of Section VII.2 of the Order with the following clarifications:
In meeting Section 5.2.1.8 of the draft ANS 3.1, you will provide training in supervising skills to new senior licensed operators subsequent to their obtaining a Senior Reactor Operator license but within six months after they are assigned shift duties as a Senior Reactor Operator.
Should you have any questions, please feel free to call us.
Sincerely, es G.
eppler Director cc:
L. Reyes, Senior Resident Inspector Local PDR N. Mosely, Director, DROI NSIC S. Bryan, A/D FC, DROI TIC Harold W. Kohn Mr. T. Murray, Station Ohio Power Siting Commission Superintendent Helen W. Evans Central Files l
Reproduction Unit NRC 20b PDR 8 0 0 7 0 P 0$/o