Discusses Proposal for Meeting Requirements of NRC 800305 Order to Modify License,Section VII.2.Commitments Referenced in 791206 Draft ANS 3.1 Are Acceptable,W/ Exception of Section 5.2.1.8
ML19318C811
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/11/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8007020310
Download: ML19318C811 (1)


Text

UNITED STATES E"

'n NUCLEAR REGULATORY COMMISSION 3

~ I e

REGION 111 f*

799 ROOSEVELT ROAD o

GLEN ELLYN,ILLINolS 60137 June 11, 1980 Docket No. 50-346 Toledo Edison Company ATTN:

Mr. R. P. Crouse Vice President Nuclear Edison Plaza Toledo, OH 43652 Gentlemen:

We have reviewed the proposal in your March 28, 1980, letter (Serial No.

1-123) for meeting the requirements of Section VII.2 of our March 5, 1980, Order to Modify the License.

We find your commitments referenced in your letter to the December 6, 1979, draft of ANS 3.1 acceptable for meeting the requirements of Section VII.2 of the Order with the following clarifications:

In meeting Section 5.2.1.8 of the draft ANS 3.1, you will provide training in supervising skills to new senior licensed operators subsequent to their obtaining a Senior Reactor Operator license but within six months after they are assigned shift duties as a Senior Reactor Operator.

Should you have any questions, please feel free to call us.

Sincerely, es G.

eppler Director cc:

L. Reyes, Senior Resident Inspector Local PDR N. Mosely, Director, DROI NSIC S. Bryan, A/D FC, DROI TIC Harold W. Kohn Mr. T. Murray, Station Ohio Power Siting Commission Superintendent Helen W. Evans Central Files l