ML19318C375

From kanterella
Jump to navigation Jump to search
Forwards LER 80-034/03L-0
Date released: 11/28/2019 Download: ML19318C375


LER 80-034/03L-0:on 800531,during Mode 1 Operation,Leak Developed on Charging Pump B Suction Pipe at Coupling for Capped Test Connection Line.Caused by Vibration.Defective Pipe Spool Piece Will Be Replaced
ML19318C381
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/26/1980
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19318C381 (1)
Forwards LER 80-034/03L-0
ML19318C374
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/26/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19318C374 (1)