Forwards IE Insp Rept 50-395/80-12 on 800422-25.No Noncompliance Noted
ML19318B948
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19318B947 List:
References
NUDOCS 8006300322
Download: ML19318B948 (2)


See also: IR 05000395/1980012

Text

..

.

,

f louq'o

m) 8

(,

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,,

i

E

REGION ll

o

101 MARIETTA ST

N.W.. SUITE 3100

ATLANTA, GEcRGIA 30303

          • p

MAY 21 Q

In Reply Refer To:

RII:EG&I.Z

50-395/80-12

South Carolina Electric and Gas Company

ATTN:

M. C. Johnson, Vice President

Special Services and Purchasing

P. O. Box 764

Columbia, SC 29218

Gentlemen:

This re ..es to the inspection conducted by E. Girard of this office on April 22

through 25, 1980 of activities authorized by NRC Construction Permit No. CPPR-94

for the Summer facility, and to the discussion of our findings held with you at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

6

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

,

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractc,r) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such inforoation from public disclosure. Any such application must

include a full atatement of the reasons on the basis of which it is claimed that

,

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

f

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

<

C. E. Murphp, Chief

Reactor Construction and Engineering

!

Support Branch

Enclosure:

See Page 2

8006800 D d

~

.

.. . .. .

.

. .

.

.

.

South Carolina Electric and

<

gygy n . 1980

Gas Company

-2-

.

Enclosure:

-

Inspection Report No. 50-395/80-12

cc w/ encl:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, DC 20006

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, SC '9065

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

-

Jenkinsville, SC 29065

.,

9

.

j

.