Forwards IE Insp Rept 50-364/80-10 on 800428-0501.No Noncompliance Noted
ML19318B904
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/19/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19318B905 List:
References
NUDOCS 8006300272
Download: ML19318B904 (2)


See also: IR 05000364/1980010

Text

_

_

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

/C

'

S

o

UNITED STATES

8'

8

NUCLEAR REGULATORY COMMISSION -

e

o

g

a

REGION il

o

101 MARIETTA ST

N.W., SUITE 3100

'

Y

ATLANTA. GEORGIA 30303

g.....

MAY 191980

In Reply Refer To:

RII:HLW

50-364/80-10

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by H. L. Whitener of this office on

April 28 through May 1, 1980 of activities authorized by NRC Construction Permit

.

No. CPPR-86 for the Farley facility, and to the discussion of our findings held

with Mr. Harriston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

la accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

j

withhold such information from public disclosure. Any such application must

.

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Rooa.

O

3

Should you have any questions concerni g this letter, we will be glad to discuss

them with you.

Sincerely,

r

4

,

[. C.

~%

R. C.

ewis, Acting Chief

'-

Reactor Operations and Nuclear

Support Branch

..

Enclosure:

See Page 2

-

800680097 %

.

lbff1 9 500

Alabama Power Company

-2-

,

,

Enclosure:

Inspection Report No. 50-364/80-10

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

s

H. O. Thrash

Manager-Nuclear Generation

Post Office Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, AL 35291

W. C. Petty

Manager-Quality Assurance (Design and Construction)

Post Office Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

0. D. Kingsley, Jr.

Manager, Nuclear Engineering and

Technical Services

P. O. Box 2641

Birmingham, AL 35291

,

4.-

-l

.

/$

r

.