ML19318B904
| ML19318B904 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/19/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19318B905 | List: |
| References | |
| NUDOCS 8006300272 | |
| Download: ML19318B904 (2) | |
See also: IR 05000364/1980010
Text
_
_
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
/C
'
S
o
UNITED STATES
8'
8
NUCLEAR REGULATORY COMMISSION -
e
o
g
a
REGION il
o
101 MARIETTA ST
N.W., SUITE 3100
'
Y
ATLANTA. GEORGIA 30303
g.....
MAY 191980
In Reply Refer To:
RII:HLW
50-364/80-10
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by H. L. Whitener of this office on
April 28 through May 1, 1980 of activities authorized by NRC Construction Permit
.
No. CPPR-86 for the Farley facility, and to the discussion of our findings held
with Mr. Harriston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
la accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
j
withhold such information from public disclosure. Any such application must
.
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Rooa.
O
3
Should you have any questions concerni g this letter, we will be glad to discuss
them with you.
Sincerely,
r
4
,
[. C.
~%
R. C.
ewis, Acting Chief
'-
Reactor Operations and Nuclear
Support Branch
..
Enclosure:
See Page 2
-
800680097 %
.
lbff1 9 500
Alabama Power Company
-2-
,
,
Enclosure:
Inspection Report No. 50-364/80-10
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
s
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, AL 35291
W. C. Petty
Manager-Quality Assurance (Design and Construction)
Post Office Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
0. D. Kingsley, Jr.
Manager, Nuclear Engineering and
Technical Services
P. O. Box 2641
Birmingham, AL 35291
,
4.-
-l
.
/$
r
.