Proposed Tech Spec Change Request 25 Re Limiting Conditions for Operation of Monitoring Requirements
ML19318B683
Person / Time
Site: Crane 
Issue date: 06/23/1980
From:
METROPOLITAN EDISON CO.
To:
Shared Package
ML19318B678 List:
References
NUDOCS 8006270297
Download: ML19318B683 (1)


Text

f

=-

e.,

O 3E:

2-9 5

LIMIT!hG CCNDITIONS FOD OPERATION 2.0

.t?.!iCO.G RE0u!2EMENi5 Seecificatien fCont'd)

Seeciff cation fCont'di a

f.

Radioactive gas and particulates 3.

The valves (Unit 1: AH','IA and S

purged frcn the reactor building shall AH-VIS and Campers: Unit 2: 05129 A/D uA be filtered through the high efficiency and D5129 B/C) shall be interlocked particulate air filters and charcoal to close or recirculate, respectively y

absorbers on receipt of a high radiation signal o

from the Reactor Building Exhaust Z

g.

The maximtra activity to be con-Monitor (Unit 1: R!t-A9; Unit 2: HP-R-y tained in one gas decay tank shall not 225 and HP-R-226) respectively.

v3 exceed 8800 curies (ecuivalent to Xe-133).

C.

The flow rate for radioactive effluent streams and the Auxiliary h.

When the release rate of radio-and Fuel Handling Suilding and the active materials in gateous wastes, Reactor Bufiding, shall be conitored averaged over a calendar quarter and recorded. Gaseous effluents from

exceeds, the Waste Gas Decay Tanks and 3

Of 3m the Reactor Building Purge Exhaust

{ gi 3,6 x 10 g shall be continuously eenitored and recorded.

(noblegas) or D. ' Radioactive gaseous waste sampling 0.005 uCi/sec (iodine-131 and and activity analysis shall be per-particulates with formed in accordance with Table 2.3-2.

half-lives greater than 8 days)

E.

The waste gas decay tank effluent monitor (Unit 1: Rti-A7; Unit 2: WDG-A-the licensee shall notify the NRC with-1480) shall be tested using the in-

=d:E in 30 days; identifying the causes and stalled check scur:e or ecuivalent describing the pecposed pecgram of ac-prior to any release of radioactive tion to reduce such release rates.

gas from a holdup tank and shall be calibrated quarterly using a re-ferenced calibration source in a controlled reproducible geometry.

F.

During power operation, the con-densor vacuum pump dis:harge shall be continuously monitored fer gross gaseous activity. The monitor shall not be inoperable for more than a week. Whenever this conitor is in-operable, a grab sample shall be D** D

  • D'O h

taken daily and analy:ed for cross I

J radioactivity. (s.v ).

G.

Facility records shall be main-tained of radioactive concentration, NOTE:

For the period of the purge, replace release ratio and volune of each Section 2.1.2.B.3 as follows:

batch of gaseous effluents released "Only for the period of the purge of the TMI-II reactor building atmosphere, pursuant to the Commission Order for Temporary Modification of License, dated June 12, 1980, Section 2.1.2.B.3 of the Appendix B Technical Specifications is superseded by the following:

Unit-I valves AH-V1A and AH-V1B shall be interlocked to close or recirculate on receipt of a high radiation signal from the reactor building exhaust r.

monitor RM-A9.

The interlocks from the Unit-II reactor building exhaust Mr monitors HP-R-225 and HP-R-226 which initiate closure or recirculation of the Unit-II dampers D5129 A/D and D5129 B/C may be bypassed in accordance with procedures approved pursuant to Append *x A Technical Specification 6,8,2 8006270 N[

.