ML19318B670

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Use of Improper Seismic Design Criteria for Design of QA Level I 3/8-inch & 5/8-inch Instrumentation & Control Tubing
Date released: 11/28/2019 Download: ML19318B670


Final Deficiency Rept Re Use of Improper Seismic Design Criteria for Design of QA Level I 3/8-inch & 5/8-inch Instrumentation & Control Tubing.Improperly Designed Tubing Sys Already Installed Will Receive Appropriate Mods
ML19318B676
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/10/1980
From: Casiglia J
DETROIT EDISON CO.
To:
References
Download: ML19318B676 (3)
Forwards Final Deficiency Rept Re Use of Improper Seismic Design Criteria for Design of QA Level I 3/8-inch & 5/8-inch Instrumentation & Control Tubing
ML19318B669
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/10/1980
From: Fahrner W
DETROIT EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19318B669 (1)