ML19318B635

From kanterella
Jump to navigation Jump to search
Forwards LER 80-003/03L-0
Date released: 01/03/2020 Download: ML19318B635


Forwards LER 80-003/03L-0
ML19354C317
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/20/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19354C317 (1)
LER 80-003/03L-0:on 800528,2H Diesel Generator Frequency & Voltage Response Was Not Verified Every 8-h,contrary to Tech Spec.Caused by Faulty Lead on Monitoring Instrumentation. Offsite Power Sources Verified & Found Acceptable
ML19318B634
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/20/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318B634 (2)