f0 DUKE POWER COMPANY Od
~'//.3 Powra Buxt.nzwo 422 Socin Cnunen SrazzT. CHARI4TTz. N. C. 28242
!N WILLIAM O. PA R M E R, J R.
Vicr Patsiotut June 9, 1980 Ant A 704 Strau PacovCTiou 3,3..o.3 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, CA 30303 Re: RII: GF'1 50-413/80-07 50-414/80-07
Dear Mr. O'Reilly:
Duke Power Company does not consider any information contained in the subject IE Inspection Report to be proprietary.
Very truly yours, t
- 0. P William O. Parker, Jr.
ROS/sch cc:
Mr. G. F. Maxwell NRC - Construction Catawba Nuclear Station 1
0 d
e I
h 0d 800627 Q
L
'.2
o
(
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
E REGION 11 8
o 101 MARIETTA ST N.W SUITE 310o ATLANTA, GEORGIA 30303 AfAY 2 0 m In Reply Refer To:
RII:GFM 50-413/80-07 50-414/80-07 Duke Power Company ATTN:
W. O. Parker, Jr.
Vice President, Steam Production P. O. Box 2178 Charlotte, NC 28242 Gentlemen:
This refers to the inspection conducted by G. F. Maxwell of this office on April 1 through 30, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Station, Units 1 and 2 facility, and to the discussion of our findings held with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.
During the inspection it was found that certain activities under your license appear to be in noncompliance with NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Corrective actions to prevent recurrence were completed prior to the conclusion of this inspection; therefore, a reply is not requested.
i In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains l
f any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-nation identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
8006270'2 M r rrr e = -
..__J_'__1..;___-
Duke Power Company MAY 2 01980 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, C. E. Murphy, hi Reactor Construction and Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation 2.
Inspection Report Nos. 50-413/RO-07 and 50-414/80-07 f
cc w/ encl:
J. W. Hampton, Station Manager P. O. Box 392 Ciover, SC 29710 D. G. Beam, Project Manager P. O. Box 223 Clover, SC 29710
-