ML19318B586

From kanterella
Jump to navigation Jump to search
Provides H Obler Re Facility Restart for Response
ML19318B586
Person / Time
Site: Crane 
Issue date: 04/15/1980
From: Sarbanes P
SENATE
To: Kammerer C
NRC COMMISSION (OCM)
Shared Package
ML19318B585 List:
References
NUDOCS 8006270106
Download: ML19318B586 (1)


Text

_. _ _ _ _ _ _.

~

a a..

Elititeb state

&citate d

he-r5

[ qO ('

n n

m April 15, 1980 P

g l

p Date p

Re: Bestoration of the undamaged reactor at the Three c.

'e

\\-

Mile Island plant.

g

\\> -

r' f

x Ee f

4

+'

p 49 grx

~

p%

Respectfully referred to:

b 6

Carlton Kanmerer bi Mb Director, Office of Congressio'hal Affairs eI c-Nuclear Regulatory Ccmnission

(

c-

@ T CD 1717 H Street, NW h

M, S

g Washington, DC 20505 pF C

s E

necause of the desire of this office to bc O

resp'onsive to all inquiries and communications, O

F e

g p e g y?

m.

o.

, _ _ 1eerati.n of th att.chee is,eenestce.

Your findingn and views, in duplicate form, 9

g a1ong with return of the enclosure, at your r,

T" U

'?

D @'

first convenience, vill be appreciated.

s

<?J )l.2b 07 Q,G'EPR

~

l '~ -

United states senator, Maryland s

r-g c-Please rep 1y to:

2327 Dirksen Senate Office Bldg.

[,h y

pg y

. ash 1ngton, e.c. 2o,1,

~

.ee m.

9 p

g, m.1e h _ : 2e2 22,.2,2,.

e Enclosure t

1 UNITED STATES OF /JtERICA NUCI. EAR REGULATORY COMMISSION

  • # 199 f

CCMMISSIONERS:

g h, jS* p\\

v 7 F-'

Joseph M. Hendrie, Chair =an A

Victor Gilinsky 9 \\c N

M. [0.. M Richard T. Yannedy Peter A. Bradford e a*Jp 1

John F. Ahearne C

~

2e go s

%l l ie.

)

In the Matter of

)

)

METROPOLITAN EDISON CCMPANY Docket P;o. 50-289 (Three Mile Island Nuclear Station,

)

Unittio.1)

ORDER AND NOTICE OF HEARING I.

The Metropolitan Edison Cc=;any (the licensee) is holder of Facility C:erating License No. DPR-50 wnich authori:es the operation of the nuclear power reactor kncwn as Three Mile ksland Nuclear Station, Unit Nc.1 (the facility or TMI-1), at steady state power levels not in excess of 2535 cegawatts thermal (ra ad power).

The facility is a Babecek and Wilecx (B&W) designed press:urized water reactor (PWR) located at the licensee's site ten miles southeast cf Harristur;, Pennsyl-vania.

II.

On July 2,1979, the Ccmmission ordered that the facility remain in a cold shutdown c ndition until further order of the C =missior: and stated that a bearine will be conducted prior to any ra. start of the facility.

On the basis of that er any fur ner coeration will be per-Tne C:missicn herein specifies the DUPLICATE DOCUMENT to gcVern #Urt.:er Orcceeding!,n On; Entire document previously entered into system under:

the C =ission has deter ::ined that

((O ANO No. of es: