Provides Status & History of Actions Re Facility Restart,In Response to Request for Reply to H Obler Ltr.Preparations for Restart Hearing Required More than Guidelines in Commission 790809 Order.Hearing Estimated to Begin Oct 1980
ML19318B584
Person / Time
Site: Crane 
Issue date: 06/16/1980
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Sarbanes P
SENATE
Shared Package
ML19318B585 List:
References
NUDOCS 8006270102
Download: ML19318B584 (2)


Text

_ __

C W

JUN 16 1980 DISTRIBUTION: Courtesy Cy.

E JCook Glainas Docket File w/inc.

HBerkow/WRussell TJCarter NRC PDR dg DMu11er RReid L PDR NRR Rdg Dross DDilanni w/inc.

Docket No. 50-289 ED0 Rdg RMattson EHylton WDircks DEisenhut Green Ticket File HDenton SECY-0800768 TMI Site r/f ECase OELD TMI PS r/f The Honorable Paul S. Sarbanes t er (ED08797) 1 ns United States Senate MSt1ne BSnyder Washington, D. C.

20515 AFerguson Gray File-330 rm.

fg e(co T

Dear Senator Sarbanes:

This letter is in response to your request for a reply to Mr. Obler's letter concerned with the return of Three Mile Island Unit No.1 (TMI-1) to operation.

We at the Comission understand the concerns with respect to the financial burden of General Public Utilities which could be partially relieved if TMI-l could resume operation. However, the Nuclear Regulatory Comission is by law limited to the regulation of the safety of nuclear reactors.

On July 2,1979, the Comission ordered that TMI-l remain in a cold shutdown condition until further order by the Comission itself and stated that a public hea. jag would be held prior to restart of THI-1. The Comission believes that sublic participation.is a vital ingredient dealing with those matters related to the TMI-l restart.

On August 9,1979, the Comission issued an additional Order on TMI-1 specifying the basis for the Shutdown Order and the procedures to gcvern the hearing regard-ing any TMI-1 restart. On the basis of this hearing, the Comission will determine whether any further operation of TMI-l will be permitted and, if so, under what conditions.

I have enclosed a copy of the August 9,1979, Order for your information.

The Comission's Order also identifies a number of items that nust be resolved prior to restart. These items, which are listed on pages 5-7 of the Order, include but go beyond that required for restart of other Babcock & Wilcox design pres-surized water reactors similar to TMI-l and 2.

Included in these additional items are items recocinended by the Lessons Learned Task Force, which studied the TMI

' accident.

The Comission carefully considered the time required for ccgleting all tasks related to the Order on TMI-1 and which must be cowleted prior to any restart of TMI-1. A Comission schedule calling for expeditious handling of the necessary L

NRC staff actions and procedural actions required for the hearing process is pro-p vided on the last page of the Comission's Order. Preparations for the hearing have required more than the Comission's guidelines anticipated. Our current h

best estimate for the hearing to conenence is October 1980.

y

(

8006c7 0102 y

s g

a 1

The Honorable Paul S. Sarbanes I am pleased to provide you with this inferrr.ation.

Sincerely,

%ed)T. A.Rehm I

William J. Dircks

-Acting Executive Director for Operations

Enclosures:

\\d

1. 3/30/30 Ltr. Fm.

lienry D. Obler

2. 8/9/79 Order 1

be =l /)K e

L DD:NRR

/

EGCase l

  • See previous yellows for concurrences g/g /

6/ /80 DRB#Q C-0RB#4:DL AD-0R.: DL.......D:

A-ED0 O,,,Ce y,

...y.

.an.... /c.b.RR.eid.*.....

.TMNova k.*.

1.s eph y t.... li?D.enton....

.WJD.ircks..

suRNaue o nT e >;.........

' NRC,ORM 318 (9 76) NRCM 0240 DU.S. GOVERNMENT PRINTING OFFICE: 1979 289-369

1

n., ;-

)

'. e : e e

... ~.

I,. Its

  • I

.e e

..s f:S g j-dfOY/

CtlR..Lb CECCCg a 3C f-x de dd 5mkW

%v 4 % Laaem.m ym eet 4 e unL&anut y Ms & tL caQo.wev w& L gbin ask me

} % % k cy a a y p h u & trL o ' M X 4

au mar g[ y n {3 p eu L

MI Q

l f

'~ '

_ _ _.