Suppl Info for Final Deficiency Rept Re DBA Movements of Steel Containment Vessel.All Addl Lines Reanalyzed.New Supports & Changes to Existing Supports Needed for RHR Spray Header Piping
ML19318B440
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/18/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19318B439 List:
References
NCR-CE8, NUDOCS 8006260162
Download: ML19318B440 (1)


Text

--

g6

~ ENCLOSURE ,

O. ,a 9

-... SEQUOYAH NUCLEAR' PLANT UNITS 1 AND 2 DBA MOVEMENTS OF THE STEEL CONTAINMENT VESSEL

/-

Q1

-/"

NCR CEB 79-19 "p 10CFR50.55(e)

SUPPLEMENTAL INFORMATION Because 'of 'some confusion over . responsibility with a contractor, the RHR spray- header piping '~as not reanalyzed for DBA movement of the steel'-

containment vessel . V).. This reanalysis should have been accomplished

as part of.'the rece-- '

'o NCR CEB 79-19.

TVA has investigat- _ oversight and has found that there are no additional lines why . , alyses and contractor analyses join that

-vere not-reanalyzed in a .ru with NCR CEB 79-19.

TVA has now completed the reanalysis of the RHR spray header piping. -

This reanalysis shows that new supports are required, plus changes-to existing supports. These new supports are being designed and the required

_ ; changes to existing supports are being detailed. The support designs will . _ .

_ _ ,be transmitted to Sequoyah Nuclear Plant site for fabrication and instal-lation.

The new supports for the RHR spray header line and the required changes to the existing supports will be installed before criticality-for Sequoyah unit'1.

t 8006260JQ

.