ML19318B440

From kanterella
Jump to navigation Jump to search
Suppl Info for Final Deficiency Rept Re DBA Movements of Steel Containment Vessel.All Addl Lines Reanalyzed.New Supports & Changes to Existing Supports Needed for RHR Spray Header Piping
ML19318B440
Person / Time
Site: Sequoyah  
Issue date: 06/18/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19318B439 List:
References
NCR-CE8, NUDOCS 8006260162
Download: ML19318B440 (1)


Text

.

~ ENCLOSURE g6 O.,a 9

Q1

-... SEQUOYAH NUCLEAR' PLANT UNITS 1 AND 2

/-

DBA MOVEMENTS OF THE STEEL CONTAINMENT VESSEL

-/"

NCR CEB 79-19 "p

10CFR50.55(e)

SUPPLEMENTAL INFORMATION Because 'of 'some confusion over. responsibility with a contractor, the RHR spray-header piping '~as not reanalyzed for DBA movement of the steel'-

containment vessel. V)..

This reanalysis should have been accomplished

as part of.'the rece--

'o NCR CEB 79-19.

TVA has investigat-

_ oversight and has found that there are no additional lines why.

, alyses and contractor analyses join that

-vere not-reanalyzed in a.ru with NCR CEB 79-19.

TVA has now completed the reanalysis of the RHR spray header piping.

This reanalysis shows that new supports are required, plus changes-to existing supports. These new supports are being designed and the required

_ ; changes to existing supports are being detailed. The support designs will

_ _,be transmitted to Sequoyah Nuclear Plant site for fabrication and instal-lation.

The new supports for the RHR spray header line and the required changes to the existing supports will be installed before criticality-for Sequoyah unit'1.

t 8006260JQ

.