Confirms Areas Needing Clarification in Response to IE Bulletin 79-01B Per 800514 Site Insp.Requests Written Response within 24-h of Receipt of Ltr If Actual Plans & Actions Differ from Described Requirements
ML19318B299
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/23/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
IEB-79-01B, IEB-79-1B, NUDOCS 8006250220
Download: ML19318B299 (2)


Text

. - -.

UNITED STATES 74

  • g V asonq%

NUCLEAR HEGULATORY COMMISSION g

g nEri:n i G

f

$31, ARK AVENUE e

xina osr enussia,,Ennsvi.vania is4oS MAY 2 31980 Docket No. 50-333 Power Authority of the State of New York James A. FitzPatrick Nuclear Power Plant ATTN: Mr. Raymond J. Pasternak Resident Manager P.O. Box 41 Lycoming, New York 13093 Gentlemen:

The staff review of your May 1980 submittal entitled " Response to U.S. Nuclear Regulatory Commission IE Bulletin 79-01B for James A. FitzPatrick Nuclear Power Plant" has been completed.

During a site inspection, May 14, 1980, it was pointed out to Mr. V. Childs the areas where clarification of the report was needed.

It is our understanding that the following will be accomplished.

a.

Components identified as inside primary containment on the system compo-nents sheets will have the system component evaluation work sheet page reference identified.

b.

The plant identification number listed on the system components sheet are to be identified on the system component evaluation work sheets.

c.

Components identified as outside primary containment that do not meet the accident service conditions as given in the HELB temperature and pressure transient curves, References 1A through 2AY, of your May 1980 report are to be identified in a reference section of the report.

d.

Provide a date when your May 1980 report will be corrected and submitted to the Nuclear Regulatory Commission and also provide a date for the sub-mittal of the final report, which will include the analysis of high energy line breaks (HELB), aging, and submergence on systems inside and outside primary containment.

If our understanding of your planned actions and requirements described above is not in accordance with your actual plans and actions being implemented please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of this letter.

Sincerely, Boyce H. Grier Director cc w/ encl: (See next page)

P062 5 0 2.2-O Q

Power Authority of.the State of New York 2

cc w/ enc 1:

George T. Berry, President and Chief Operating Officer P. W. Lyon, Senior Vice President-Nuclear Generation A. Klausmann, Director, Quality Assurance M. C. Cosgrove, Quality Assurance Supervisor J. F. Davis, Chairman, Safety Review Committee C. M. Pratt, Assistant General Counsel G. M. Wilverding, Licensing Supervisor i

ll