ML19318B253
| ML19318B253 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/14/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19318B254 | List: |
| References | |
| NUDOCS 8006250173 | |
| Download: ML19318B253 (2) | |
See also: IR 05000423/1980002
Text
Te
t o.
'
p,
UNITED STATES
o
NUCLEAR REGULATORY COMMI5slON
y
o
REGION I
$
$
$31 PARK AVENUE
O
f
KING OF PRUSSI A. PENNSYLVANIA 19406
%*****/
HAY 14 im
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering Operations
P. O. Box 270
Hcrtford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-423/80-02
This refers to the inspection conducted by Mr. A. Cerne of this office on April
1-2, 1980 at the Millstone Nuclear Power Station, Unit 3, at Waterford, Connecticut
of activities authorized.hy NRC License No. CPPR-ll3 and to the discussions of
our findings held by Mr. Cerne with Mr. S. Toth and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
>
inspector.
.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in ::ubparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8006230973
.
.
-
.- - --
-- . - -
.
4
Northeast Nuclear Energy Co.
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
@bert T. Carlson, Chief ~y.
r
Ro
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-423/80-02
cc w/ encl:
K. W. Gray, Supervisor of Construction Quality Assurance
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
D. G. Diedrick, Manager of Quality Assurance
(
.
i
t