Forwards IE Insp Rept 50-423/80-02 on 800401-02.No Noncompliance Noted
ML19318B253
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/14/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19318B254 List:
References
NUDOCS 8006250173
Download: ML19318B253 (2)


See also: IR 05000423/1980002

Text

Te

t o.

'

p,

UNITED STATES

o

NUCLEAR REGULATORY COMMI5slON

y

o

REGION I

$

$

$31 PARK AVENUE

O

f

KING OF PRUSSI A. PENNSYLVANIA 19406

%*****/

HAY 14 im

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering Operations

P. O. Box 270

Hcrtford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/80-02

This refers to the inspection conducted by Mr. A. Cerne of this office on April

1-2, 1980 at the Millstone Nuclear Power Station, Unit 3, at Waterford, Connecticut

of activities authorized.hy NRC License No. CPPR-ll3 and to the discussions of

our findings held by Mr. Cerne with Mr. S. Toth and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

>

inspector.

.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in ::ubparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8006230973

.

.

-

.- - --

-- . - -

.

4

Northeast Nuclear Energy Co.

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

@bert T. Carlson, Chief ~y.

r

Ro

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-423/80-02

cc w/ encl:

K. W. Gray, Supervisor of Construction Quality Assurance

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

D. G. Diedrick, Manager of Quality Assurance

(

.