ML19318B233
| ML19318B233 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/02/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19318B234 | List: |
| References | |
| NUDOCS 8006250152 | |
| Download: ML19318B233 (2) | |
See also: IR 05000245/1980004
Text
&
.
.
%,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
D
j
REGION I
c
4
- ,d
KING OD PRUSSIA, PENNSYLVANIA 19406
Docket Nos.
50-245
W2
20
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Combined Inspection 50-245/80-04 and 50-336/80-03
This refers to the inspection conducted by Mr. J. Shedlosky of this office on
March 1 through March 29, 1980 at the Millstone Nuclear Power Station,
Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21
and DPR-65 and to the discussions of our findings held by Mr. Shedlosky with
Mr. Opeka and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2 Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any infomation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which add esses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The infomation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
800625 0 15(2.
-
)
.
.
Northeast Nuclear Energy Company
2
MAY 2
1980
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
'
.
,
Eld
J. Brunner, Chief
-
Rea or Operations and Nuclear
Su port Branch
Enclosure: Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/80-04 and 40-336/80-03
'
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
..
.
_
_
._ _.
__ _
_