Forwards IE Insp Repts 50-245/80-04 & 50-336/80-03 on 800301-29.No Noncompliance Noted
ML19318B233
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/02/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19318B234 List:
References
NUDOCS 8006250152
Download: ML19318B233 (2)


See also: IR 05000245/1980004

Text

&

.

.

%,

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

D

j

REGION I

c

631 PARK AV NUE

4

          • ,d

KING OD PRUSSIA, PENNSYLVANIA 19406

Docket Nos.

50-245

W2

20

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Combined Inspection 50-245/80-04 and 50-336/80-03

This refers to the inspection conducted by Mr. J. Shedlosky of this office on

March 1 through March 29, 1980 at the Millstone Nuclear Power Station,

Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21

and DPR-65 and to the discussions of our findings held by Mr. Shedlosky with

Mr. Opeka and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2 Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any infomation that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which add esses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The infomation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

800625 0 15(2.

-

)

.

.

Northeast Nuclear Energy Company

2

MAY 2

1980

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

'

.

,

Eld

J. Brunner, Chief

-

Rea or Operations and Nuclear

Su port Branch

Enclosure: Office of Inspection and Enforcement Combined

Inspection Report Number 50-245/80-04 and 40-336/80-03

'

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

..

.