Forwards IE Insp Rept 50-395/80-13 on 800301-0430.No Noncompliance Noted
ML19318B183
Person / Time
Site: Summer 
Issue date: 05/16/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19318B184 List:
References
NUDOCS 8006250102
Download: ML19318B183 (2)


See also: IR 05000395/1980013

Text

_-

._

77c

.

. ...

o

UNITE 3 STATES

8

NUCLEAR REGULATORY COMMISSION

gj(> -894

,

o

e

REGION 11

.

a

r

\\ . . . . . p*

,

101 MARIETTA ST N.W SUITE 3100

ATLANTA. GEORGIA 30303

,

Is Reply Refer To:

RII:JLS

50-395/80-13

South Carolina Electric and Gas Company

ATTN:

T. C. Nichols, Jr., Vice President

Power * Production and Systems Operations

,

P. O. Box 764

Columbia, SC 29218

Gentlemen:

1

This refers to the inspection conducted by J. L. Skolds of this office on March 1

'

through April 30, 1980 of activities authorized by NRC Construction Permit No.

CPPR-94 for the V. C. Summer facility, and to the discussion of our findings

held with 0. S. Bradham at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

1

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is oroprietary, and should be prepared so

that proprietary information identifie? in the application is contained in a

separate part of the document.

If we ao not hear from you in this regard within

,

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

a.

~.y

f. [.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

.

Enclosure:

(See Page 2)

8 0062 50/02 7

'Q

I

}

.

-

South Carolina Electric and Gas Company -2-

ggg,

,

Enclosure:

Inspection Report No. 50-395/80-13

cc w/ enc 1:

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, SC 29065

s

T. B.-Conners, Jr.

Corners, Moore and Corber

1747 Pennsylvania Avenue, N.W.

Washington, DC 20006

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, SC 29065

1

d#

'

=. j g

-

I

,

,

m..---mmasm

-.

__.m

,,,

-

._ __

. - _ _