Forwards QA Program Insp Rept 99900005/80-01 on 800324-28 & Notice of Deviation
ML19318A744
Person / Time
Issue date: 04/16/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Johari Moore
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19318A739 List:
References
REF-QA-99900005 NUDOCS 8006240103
Download: ML19318A744 (2)


Text

1) wan O#

UNITED STATES -

o

],

~

NUCLEAR REGULATORY COMMISSION w

L'

j REGION IV 0

g-611 RYAN PLAZA oRIVE, SUITE 100 s 4

D

,o ARLINGTON, TEXAS 76012 16 APR 1980 Docket No. 99900005/80-01 i

Westinghouse Electric Corporation Nuclear Fuel Division ATIN:

Mr. J. S. Moore General Manager Box 355 Pittsburgh, Pennsylvania 15230 Getelemen:

This refers to the QA Program Inspection conducted by Mr. W. M. McNeill of this office on March 24-28, 1980, of your facility at Columbia, South Catolina, associated with the manufacture and fabrication of nuclear fuel assemblies and to the discussion of our findings with Mr. R. R. Cost and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed

{

to' assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured frou others. Ycu should therefore not conclude enat the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection. consiste.d of an examination of procedures and representative recoras, interviews with personnel, and observations by the inspector.

During this inspection it was found that the implementation of your QA program f ailed to meet certain commitments in your Topical Report No. WCAP 7800.

The specific; findings and references to the pertinent require m es are identifiad in the enclosures to this letter..

Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct these items, 4

(2) a description of steps that have been or will be ta hn to prevent recur-rence, and.(3)'the dates your corrective actions and preventive measures were or will be completed.

y

?

l 8 006240lb1 m

Westinghouse Electric Corporation 2

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code-of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room. If this report contains any information that you believe to be proprietary, it'is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons or. the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss.them with you.

Sincerely,

\\

/)

Lb b

(%mo Uldis Potapovs, Chiei:

Vendor Inspection Branch

Enclosure:

Inspection Report No.

99900005/80-01 4

+