ML19318A734

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800522 Interim Deficiency Rept Re Pump Failures on Comsip post-LOCA Hydrogen Analyzers.Review of Matter Will Be Completed During Future Insp
ML19318A734
Person / Time
Site: Perry  
Issue date: 06/10/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8006240092
Download: ML19318A734 (1)


Text

s>R"'009 UNIT ED STATES

(

g NUCLEAR REGULATORY COMMISSION 0

3 S

REGION 111 0

'f 799 ROOSEVELT ROAD

/

otsu ettyn, att NO s sois7 JUN 10 880' Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your interim report dated May 22, 1980, pursuant to 10 CFR 50.55(e) regarding Pump Failures on Consip Past LOCA H 2

Analyzers. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely,

-m

, k".p, _

i,

L

,c Gaston Fiorelli, Chief Reactor Construt, tion and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio 80062400 % 3