Forwards IE Insp Rept 50-395/80-09 on 800421-25.No Noncompliance Noted
ML19318A698
Person / Time
Site: Summer 
Issue date: 05/12/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19318A699 List:
References
NUDOCS 8006240045
Download: ML19318A698 (2)


See also: IR 05000395/1980009

Text

/ /C

e na

~s5-y75

  1. o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

^

$

n

$

E

REGION 11

3

b[

o,

101 MARIETTA ST., N.W., SUITE 3100

o

ATLANTA, GEORGIA 30303

In Reply Refer To:

ggy 121980

RII:ALC

50-395/80-09

50-395/80-09

South Carolina Electric and Gas Company

ATTN:

T. C. Nichols, Jr., Vice President

,

Power Production and Systems Operations

P. O. Box 764

Columbia, SC 29218

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

April 21-23, 25, 1980 of activities authorized by NRC Construction Permit No.

CPPR-94 for the Virgil C. Summer Nuclear Station facility, and to the discussion

of our findings held with 'i. T. Babb at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

ShouIdyouhaveanyquestionsconcerningthisletter,wewillbegladtodiscuss

them with you,

l

1

Sincerely,

.

.

.

'"i

. - ilip S

r, C ief

Fuel Facilit and Materials

Safety Branch

Enclosure:

(See Page 2)

soost40M q

.

South Carolina Electric and Gas Company -2-

MRY 121smo

.

Enclosure:

Inspection Report No. 50-395/80-09

cc w/ encl:

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, SC 29065

s

T. B. Conners, Jr.

Corners, Moore and Corber

1747 Pennsylvania Avenue, N.W.

Washington, DC 20006

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, SC 29065

.

W

.

b

-s,

-