Ack Receipt of Describing Program for Removal of Rows 1 & 2 U-bend Samples from D Steam Generator.Proposed Steam Generator Evaluation Program Found Acceptable.Provides Schedule for Reporting Results of Westinghouse Lab Analyses
ML19318A290
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/22/1980
From: Clark R
Office of Nuclear Reactor Regulation
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8006190166
Download: ML19318A290 (2)


Text

_ _ _ _ _ _ _

ggg,9

,/

g U ITED STATES y

g NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C. 20555 k..... f May 22, 1980 Docket No. 50-344 Mr. Charles Goodwin, Jr.

Assistant Vice President Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204

Dear Mr. Goodwin:

We have reviewed your letter of March 27, 1980, in which you described both the program for removal of row 1 and row 2 U-bend tube samples from Trojan's D steam generator and the subsequent laboratory analyses to be performed by Westinghouse Electric Corporation.

In addition, we had the benefit of a meeting with representatives of Westinghouse on April 15, 1980 to discuss this issue. Based on our review of the information in your letter and the information presented in this meeting, we have concluded that the proposed PGE/ Westinghouse steam generator tube evaluation program acceptably addresses the issues of concern.

From discussions with your staff, we understand that you will be examining the U-bend region of all row 1 tubes in the D steam generator and a sample of such tubes in the B steam generator during the current refueling outage.

We agree with this course of action. This additional inspection should pro-vide increased assurance of tube integrity in the interim period until the laboratory results are available.

We request that you notify us of the results of this additional tube examination prior to steam generator closure so that a decision can be made at that time as to the acceptability of the results.

To ensure that timely action can be taken in the event it should be found necessary on the basis of the laboratory results, we request that you adhere to the following schedule for reporting interim and final results of the laboratory analyses:

July 11, 1980 Interim report describing results of non-destructive testing (NDE)

August 15, 1980 Interim report describing results of destructive evaluation November 28, 1980 Final Report 8006190/hk

)

s Mr. Charles Goodwin, Jr. Please contact us if you have any questions concerning this matter.

Sincerely, L

Rob Clark, Chief Operating Reactors Branch #3 Division of Licensing cc:

See next page I

1 i

I 1

1 l

'a

'Mr. Charles Goodwin, Jr.

Portland General Electric Company cc: Mr. J. W. Durham, Esquire Robert M. Hunt, Chairman Vice President and Corporate Counsel Board of County Connissioners Portland General Electric Cocpany Columbia County 121 S.W. Salmon Street St. Helens, Oregon 97501 Portland, Oregon 97204 Warren Hastings, Esquire Counsel for Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204 Mr. Jack W. Lentsch, Manager Generation Licensing and Analysis Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204 Columbia County Ccurthouse Law Library, Circuit Court Room St. Helens, Oregon 97501 Director, Oregon Department of Energy Labor and Industries Building, Room 111 Salem, Oregon 97310 Richard M. Sandvik, Esquire Counsel for Oregon Energy Facility Siting Counsel and Oregon Department of Energy 500 Pacific Building 520 S.W. Yamhill Portland, Oregon 97204 Michael Malmros, Resident Inspector U. S. Nuclear Regulatory Comnission Trojan Nuclear Plant P. O. Box 0 Rainier, Oregon 97048 Mr. Donald W. Godard, Supervisor Siting and Regulation Oregon Department of Energy Labor and Industries Suilding, Room 111 Salem, Oregon 97310 l