ML19318A135

From kanterella
Jump to navigation Jump to search
Forwards LER 80-044/03L-0
Date released: 11/28/2019 Download: ML19318A135


LER 80-044/03L-0:on 800516,during Source Range Monitor (SRM) Operability PT.1.7.1,full in & Out Indication of SRM a Not Received & SRM D Produced Erratic Indications.Caused by Blown Drive Circuit Fuse & Moisture in Detector Connection
ML19318A141
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/11/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318A141 (2)
Forwards LER 80-044/03L-0
ML19318A134
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/11/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318A134 (1)