ML19318A052
| ML19318A052 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/08/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19318A053 | List: |
| References | |
| NUDOCS 8006180393 | |
| Download: ML19318A052 (2) | |
See also: IR 05000328/1980009
Text
. _ - .
_ - _
___ _
/b
0
g ano
/
UNITED STATES
o
8
NUCLEAR REGULATORY COMMISSION
Id GAK
g
o
g
a e
REGION il
,
o,,
[
101 MARIETTA ST., N.W SUITE 3100
. . . . . */
MAY - 81980
ATLANTA. GEORGIA 3o303
In Reply Refer To:
RII:CRM
50-328/80-9
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this office on
April 21-23, 1980 of activities authorized by NRC Construction Permit No. CPPR-73
for the Sequoyah Nuclear Plant facility, and to the discussion of our findings
held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the insnaction consisted of
selective examinations of procedures and representative re - cds, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
'
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is pr sprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
'
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
~
M '-
y
C. E. Murphy, Chief
,
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
800818o393
g
-
.
Tennessee Valley Authority
-2-
tutf - 81980
.
Enclosure:
Inspection Report No. 50-328/80-9
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 200u
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
M. J. Burzynski, Project Engineer
!
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
l
Construction Engineer
_
Post Office Box 2000
!
Spring City, TN '37381
'
H. N. Culver
249-A HBB
-
400 Commerce Avenue
Knoxville, TN 37902
l
t
d
.
.