ML19318A052

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-328/80-09 on 800421-23.No Noncompliance Noted
ML19318A052
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/08/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19318A053 List:
References
NUDOCS 8006180393
Download: ML19318A052 (2)


See also: IR 05000328/1980009

Text

. _ - .

_ - _

___ _

/b

0

g ano

/

UNITED STATES

o

8

NUCLEAR REGULATORY COMMISSION

Id GAK

g

o

g

a e

REGION il

,

o,,

[

101 MARIETTA ST., N.W SUITE 3100

. . . . . */

MAY - 81980

ATLANTA. GEORGIA 3o303

In Reply Refer To:

RII:CRM

50-328/80-9

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

April 21-23, 1980 of activities authorized by NRC Construction Permit No. CPPR-73

for the Sequoyah Nuclear Plant facility, and to the discussion of our findings

held with G. G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the insnaction consisted of

selective examinations of procedures and representative re - cds, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

'

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is pr sprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

'

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

~

M '-

y

C. E. Murphy, Chief

,

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

800818o393

g

-

.

Tennessee Valley Authority

-2-

tutf - 81980

.

Enclosure:

Inspection Report No. 50-328/80-9

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 200u

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

M. J. Burzynski, Project Engineer

!

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

l

Construction Engineer

_

Post Office Box 2000

!

Spring City, TN '37381

'

H. N. Culver

249-A HBB

-

400 Commerce Avenue

Knoxville, TN 37902

l

t

d

.

.