ML19317H453

From kanterella
Jump to navigation Jump to search
Recovery Operation Plan Tech Spec Change Request 1 Re Elimination of Balance of Plant Diesels & 13.2 Kv Line Surveillance Requirements.Replacement Pages 4.8-1 to 4.8-3 to Plan Encl
ML19317H453
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/29/1980
From: Hovey G
METROPOLITAN EDISON CO.
To:
References
TLL-215, NUDOCS 8006060368
Download: ML19317H453 (5)


Text

o Metropolian Ec'! son Company j

g F

Post Office Box 480 i

Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number May 29, 1980 TLL 215 TMI Program Office Attn:

Bernard J. Snyder, Program Director U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Uni II (TMI-2)

Operating License No. DPR-73 Decket No. 50-320 Recovery Operations Plan Change Request No. 1 Enclosed is the Recovery Operations Plan Change Request No. I regarding the ell =ination of the 30P diesels and the 13.2 kv line surveillance requirements.

This change request is made subsequent to Technical Specification Change Request No. 22 which requested the removal of the BOP diesels and the 13.2 kv line from the Technical Specifications.

Sincerely,

/s/ G. K. Hovey G. K. Hovey Director-TMI-II GKH:SDC: hah Enclosure cc:

J. T. Collins D. DiIanni H. Silver i

THIS DOCUMENT CONTAINs

\\

POOR QUALITY PAGES l

t Merecciaa

son Ocmr ey -s a *.!smes-Or : e Generar Puenc LtIt.es System 800606034,6

Three 121e Island Nuclear Statien, Uni: II (!NI-2)

Opera:ing License No. DPR-73 Docke: No. 50-320 Recoverv Ocerati:ns p*an Chante Recues:

The licensee reques s :ha: the a:: ached changed pages replace pages 4.8-1 =c 4.8-3 of the TMI-II Recovery Operations Plan.

Reasons for Chante Recues:

With :he sub=1ssien of a request for re=cval from the Recevery Technical Specifications (L1=1:ing Conditions of Opera:1cn) of :he 30P diesels and the 13.2 kv circui: fr== the Middletown Junction Station, the licensee requests the renoval of the rela:ed surveillanc'e requirements from :he Recovery Operations Plan.

The re= oval is necessary because the loads which these sources c vered can new be acce== eda:ed by utili:atien of existing Combustien Turbines, trans=1ssien and dis:ribution equipment and :he TMI-II auxiliary

ansfor:ers.

Justification fer the Chanze Recuest Wi:h the utili:a:icn of :he Combus: ion Turbines, existing ::ansmission/

distribution equip en: and the auxiliary trans:ormers as eacKup AC power sources, the 30P diesels and :he 13.2 kv line will no longer be required and therefore should be removed frc :he Recovery Technical Specifications (Limiting Conditions of Opera: ion) and :he Recovery Operaticus Plan (Surveillance Requiremen:s).

r 9

s

r

' ;.-.4 l

g e

SU VE LLANCE 4 0(**:.gugyT3

':......L

.r...

.e., e..u.c s..-

sa:-

.e..d..

3 ML.

a.5.1.1.1 Ea:n Of ne eeuire: ince:encen :f :uits =etween :ne offsita ransmission networx anc ne ensite Class IE cistri:ution syste.t snali :e e ermine FERA3LI at leas :n=e ser 7 cays :y verifying ::rrec =reaxer titgnments an: inci:2 ac :ower availa=11 y.

4.5.1.1.2 Eacn eiesel generater snail me cemenstra ec OPERA 3LI:

At l e ss / ence :er 31 cays on a 5........

.... e.,

y:

a.

. nus.s te i ai sn...

1.

'ser-fying ne fuel level in :ne :ay fuel tanx.

2.

Verifying ne fuel level in ne fuel st: rage systam.

3.

Verifying ne fuel ransfer :tm: =an te staries anc transfers fuel fr:m ne s:: rage sys:am ne cay tanx.

4 Verifying ne Class IE dieseis start fr m am:ien ::ncition anc.

ac:alerate := at leas: 900 r:m (ie 50 M: en :ne genera r) in less than =r ecual :: 10 se::nes.

l 5.

Verifying eacn Class IE ciesel genera:Or is synenreni:ec; icacec :: greater : nan er ecual :: 3000 kw, an: c erates for greater nan =r ecuai 50 minutes.

6.

Deleted.

7, Dele:ed.

S.

Verifying ne ciesel genera::r is alignec :: =revice stancey power :: the associa:ac emergency : esses.

5.

At lems: Onca mer 92 cays my verifying :na a sammle of diesei fuel

sined in ac::reance wi:n ASTM-0270-62 fre= ne fuel s crage anx is wi:nin :ne ac:a::acle limits sce:ifisc in 7acle 1 of ASTM 0975-74 wnen :necxec f:r vis::sity, water anc sociment.

Deleted.

k'

-a. x.r.: u..r e..:.e t.Ap,.g. J3 u-

.4

.2.,

a i.

f 9

-Q, : \\f ?. *. *.*.LNL.

  • C.* t.t ?. ?. ?.Lt C.N~s.t

= *

.t * * *

  • P. :..t ( *. n e. d. e.U G p )

a...

..n

  • . 3. *. *.. 1 e

o e

MM e' r bb&

e

.b e

r a

l

.9

......9..

g.

.g..

..uNC - UN

a rt-.

.-*9

a 1

e l

l

i

.* ~

O

.C U R V :. '. '..'.-Ns-. s.:. ". *. s. :u:N..t

..n.s

..e r.

...e.u..,

Deleted.

..i...-

a. e...-.,y.e. :. :... ::.

4-

.e

,en...y. eve..u.e

.2 4.5.2.1 7he s:acifite A.

usses snail te catarminec CPERAELI wita tie

reeners ::en :e: ween re uncant musses at least enca :er 7 cays by verifying
rrec: reater alignment an: in ica:ac =cwer avaiia:ility.

..3 l

. e..

0. e_.... U_i.. N u.

s.=

4. 3. 2. 3.1 Ea:n D.C. Sus rain snail :e :eterminec OPERAELI an: energi:ac witn tie :reaners coen at leas: en a mer 7 cays y verifying ::rrec treaner align-ment an: incicata: ::wer availacili y.

4.1.2.3.2 Escn 250/125-vcit tattery ank anc :narger snail se :emenstratac OPERASLI:

At least enes per 7 cays ey verifying that:

a.

1.

The ele: relyte levei of ea:n Ofic: cali is ce:-een :ne mini =m and maximum level incication marxs.

2.

The Oile: :all s:ecifi: gravi y, ::r ectac :: 77*.: an: full electrolyta level, is greatar nan er ecual = 1.20.

3.

The 0110- call vei age is greatar : Man er ecua

2.13 volts.

4 The overall tattery veitage is greatar : nan er e:ual : 250/125 voi:s.

s THP.EE MILE ISLAtic - UNIT 2 a.3-3

-