UNITED STATES
o
,
ATOMIC ENERGY COMMISSION
! (q, e<
DIRECTORATE OF REGULATORY OPERATIONS
'
v
acciousi - suite ais
f -$
23o peacur nee sr accr, soar swest
4n%v #
,
,
, , , ,
at t.4 ur 4, cconci4 sosos
0M
in Reply Refer To:
RO:II:MSK
50-313/74-1
- Arkansas Power and Light Company
ATIN:
Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas
71601
Gentlemea:
This ref.rs to the inspection conducted by Mr. M. S. Kidd of this office
on January 15-18, 1974, of activities authorized by AEC Construction
Permir No. CPPR47 for the Arkansas Nuclear One, Unit 1 facility, and
to the discu lon of cur findings held by Mr. Kidd with Mr. J. W. Anderson
b
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
,
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. These are identified in Section IV of the summary of the
enclosed report.
Regarding the recorders and meters used to display outputs from plant
radiation monitoring instruments, it is our understanding that readings
j
from these instruments will be recorded hourly.
Regarding the development of procedures needed for operation as defined in
AEC Safety Guide 33, we are concerned that the development does not appear
j
commensurate with your estimated fuel loading date. As discussed in paragraph 4
of the Details section of the enclosed report, numerous procedures have not
been written. Specifically, development of alarm procedures, chemical and
radiation control procedures, and operational test procedures represents a
major effort. In addition, our concerns regarding the initial core loading
procedure, general plant operating procedures and emergency operating
i
procedures must be resolved prior to licensing of Unit 1.
The approved
)
a
\\j
yk/
l
t
x
8 0 0 414 Of7/
,
.
.
.
.
.
.
,
,
.
(n)
-
Q
. Arkansas Power and Light company
-2-
.
JAN 3 01974
zero power physics and power ascension test procedures must also be
provided for our review at least 30 days prior to your estimated fuel
loading date, such that we can determine their adequacy before
implementation.
One new unresolved item resulted from this inspection and is identified
in Section III of the summary of the enclosed report. This item will be
examined on subsequent inspections.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
disclosure . If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be piaced
}
in the Public Document Room. Your application, or wrf tten statement,
j
should be submitted to us within 20 days. If we are aot contacted as
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
7
lG
,7en
-
Norman C. Moseley
Director
Enclosure:
RO Inspection Report No.
50-313/74-1
.
l
tj
i
l
l
__ . - . _ = . .
-
.
.
.
_
_
.
.
'
.
-
~
.
. .
.
.
h
'
l
4
Arkansas Power and Light Company
ANO-1
JAN 3 01974
RO Inspection Report No. 50-313/74-1
I
cc w/ enc 1:
H. D. Thornburg, RO
7:HQ (5)
-
DR Central Files
Regulatory Standards (3)
Directorate of Licensing (13)
cc encl. only:
.;
- PDR
- Local PDR
- NSIC
i
- DTIE, OR
- State
,
..
- To be dispatched at a later date
!
9
i
I
.
.
i
1
-
. .
. -
_ _ _ . _ . . ,
- _ - _ . _ , .
_
. - . _ _ _ _ _ _ - - - . _ , . _ _ . , .
_ - . _
- . - . - _
.