Forwards Insp Repts 50-313/72-12 & 50-368/72-08 on 721128-1201.No Noncompliance Noted
ML19317H076
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/30/1973
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19317H077 List:
References
NUDOCS 8004140559
Download: ML19317H076 (3)


See also: IR 05000313/1972012

Text

,6

-

.- .

....

..

. . . . . . . .

.

. . .

. . . .

.

-- ~ . ~ - . . - - - . - . ... .- ---

-

1

-

.

.k. l

-

, - [h) ., ' ,.h;)

'

.s

UNITED STATES

//

ATOMIC ENERGY CCMM!SS!ON

.. ;.b.;,

ox= :. z or ur .=c :.: nr.u=:a

e.

n e u e ,, o - sa

u-

e, h n e [.f

'$

2 30 P E A 0. 4 - s* E E

's- m E E , ". ; e ? -. * E S?

,

sw

a.rn, u:n s .m n

In Reply Refer To:

JAN 3 01973

I

RO:II:VLB

50-313/72-12

50-368/72-8

.

.

Arkansas Power and Light Company

Attn:

Mr. J. D. Phillips

Vice President and Chief Engineer

Sixth and Pine Streets

Pine Bluff, Arkansas 71601

.

Gentlemen:

[

This refers to the inspection conducted by Messrs. Brownlee and Crossr.an on

November 28 - December 1, 1972, of activities authorized by AEC Construction

Permit No. CPPR-57 for the Arkansas Nucleer One, Unit 1 facility, and of your

quality assurance program for work to be performed under an exemption from

the requirements of 10 CFR SC.10 for the Arkansas Nuclear One, Unit 2 faci-

lity. Our findings were discussed by Mr. Brownlee with Messrs. Moore, Bland,

and Bean of your staff and Messrs. Loth and Sly of Bechtel Engineering Corpo-

ration at the conclusica of the inspection.

<

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, to violations were disclosed.

l

Two new unresolved items resulted from this inspection and are identified ~

,

in Section III of the Summary of *he enclosed report.

These items will be

examined on subsequent inspections.

I

We have examined actions you have taken with regard to previously reported

unresolved items. These are identified in Section IV of the Sum =ary of the

enclosed report (Item 72-8/1).

In accordance with Section 2.790 of :he AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulation.,, a copy of this letter and the enclosed

d

inspection report wil.' be placed in the AEC's Public Document Room. .If this

8 0 0 414 0J31

k

!,

,

  • '.

-

.

-

l'

.

N

,

,

Arkansas Power and Light

-2-

Company

JAN 3 01973

,

report contains any information that you (or your contractors) believe to

be proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

,

be preptred so the proprietary information identified in the application is

contained in a separate part of the document.

If the report contains no

information which you believe to be proprietary, please inform us in writing'

within 20 days to this effect.

In such cases, the report, as enclosed with

this letter, will be placed in the Public Document Room.

Should you have any questions concerning this letter, you may communicate

directly with this office.

.

Very truly yours,

,

4

,m

.

'

-

'

  • ./

/

g

,

. ,4: ,. ;:') ' / , _ .%-~..___,._-

,

' John G. Davis

/ Director

,

Enclosure:

i

Inspection Report Nos.

50-313/72-12 and

i

50-368/72-8

1

l

l

-

.

.

\\

J

.

.

. - , , , - ,

. . , .

-

- - . .

. -

,

.

_-

.

-

_ _ . . -

-

-

--

--

.

l

-

,.

.

e

)

j

DIRECTORATE OF REGULATORY OPERATIONS

MONTHLY REPORT FOR DECEMBER 1972

.

!

-

.

.

Arkansas Power & Light Company (Arkansas Nuclear One, Unit

and 2) -

An inspection was conducted on November 28-December 1.

Are'us

inspected included the preoperational testing program, the onsite

training program and previously identified outstanding items.

O

The inspection revealed one violation of FSAR requirements involving

lack of review of a preoperational test procedure by the Test

Working Group. A notice of violation will be included in the

letter to the licensee.

.