ML19317H069

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-313/73-16 on 731023-26.No Noncompliance Noted
ML19317H069
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/12/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19317H070 List:
References
NUDOCS 8004110842
Download: ML19317H069 (3)


See also: IR 05000313/1973016

Text

.

.. ..

_

..

..

Documents for Public Document Room:

'

NOV 3 01973

Arkansas Power and Light Company

Docket No. 50-313/73-16

Arkansas Nuclear One - Unit 1

'

1.

Letter to Arkansas Power and' Light Company dated

November 12, 1973

2.

Letter from Arkansas Power and Light Company, J. D. Phillips,

dated November 28, 1973

3

RO Inspection Report No. 50-313/73-16.

O

.

.

'

!

i

1

gt }l

ENCLOSURE A

8004110

h2

.

.

_.

--.

..

-

-

-

.

..

,

.

.d

-

j,8 ' Q,g

l

UNITED STATES

-

f

o

o

f (jie' P '*

ATOMIC ENERGY COMMISSION

I

-

DIRECTORATE OF REGULATORY OPERATIONS

g [

-

.[

REGION It - SusT E SM

'g

kI [

j

23) PE AC MT R E E ST REET, NORTHWEST

h4 rg 50'

AT L A N T A. GCORG O A 30303

T g ss ement : f 4 04 8 0 2 0.4 5 0,

In Reply Refer To:

NOV 121973

RD:II:VLB

50-313/73-16

i

'

Arkansan Power and Light Company

Attn:

Mr. J. D. Phillips

Senior Vice President

Sixth and Pine Streets

Pine Bluff, Arkansas

71601

Gentlemen:

This refers to the inspection conducted by Mr. A. R. Herdt of this

office on October 23-26, 1973, of activities authorized by AEC

Construction Permit No. CPPR-57 for the Arkansas Nuclear One, Unit 1

facility, and to the discussion of our findings held by Mr. Herdt

with Mr. N. A. Moore at the conclusion of the inspection.

q,,

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

One new unresolved item resulted from this inspection and is identified

in Section III of the summary of the enclosed report. This item will

be examined on subsequent inspections.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room. If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld from public

disclosure. If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

\\

y

\\

/

,

_

..

. . _ _ _ .

_ _ .

.

_

._

.

_

t

<*

e

.

,

,

-,

.

>

i

/

l

j

Arkansas Power and Light Company

-2-

NOV 121973

.

-

.

-

.

J

should be submitted to us within 20 days. If we are not contacted as

i

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

t

'

Very truly yours,

!

lt

~ my.y

y>

Norman C. Moseley

f Director

Enclosure:

R0 Inspection Report No.

50-313/73-16

i

h

a

4

I

.

3

gk

i

i

_ _ _ _ _ _ . - , _ . .

. _ _

_ _ _ _ _ _ _ _ . _ . _ _ _ . . . _ _ _ _ . _ , . . _

, _ _ _ _ _ _ .

. _ .