Forwards Insp Rept 50-313/73-11 on 730218-20.Noncompliance Noted
ML19317H062
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/01/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19317H054 List:
References
NUDOCS 8004110687
Download: ML19317H062 (2)


See also: IR 05000313/1973011

Text

. - - - - .

. O~

l

_

~

$

  1. '" ' %g

UNITED STATES

I

ATOMIC ENERGY COMMISSION

p

I!/ 1 e ) **

i

DIRECTORATE OF REGULATORY CPERATICUS

c p/

nEoion n - suite eis

'g

230 PE ACHT RE E STREET, NoRT HWEST

44rts O'

AT I. A NT A, G E oRGi A 30303

Y nr essou s 14048926 4303

AUG1

1973

In Reply Refer To:

RO:II:VLB

'

.

50-313/73-11

.

Arkansas Power and Light Company

ATTN:

Mr. J. D. Phillips

Senior Vice President

'

Sixth and Pine Streets

Pine Bluff, Arkansas

71601

Gentlemen:

This refers to the inspection conducted by Messrs. Brownlee and

Kelley of this office on July 18-20, 1973, of activities authorized

by AEC Construction Permit No. CPPR-57 for the Arkansas Nuclear One,

Unit 1 facility, and to the discussion of our findings held by

Messrs. Brownlee and Kelley with Messrs. N. A. Moore and C. L. Bean

O

of your staff and Messrs. G. Katanics, B. Leonard and E. Patel of

Bechtel Engineering Corporation at the conclusion of the inspection.

Areas examined during this inspection included valve wall thickness

verification program and previously identified enforcement and un-

resolved items. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel and observations by the inspectors.

The results of our followup of previously identified matters are

contained in the enclosed report as follows:

1.

The results of our inspection of your corrective action on

previously identified violations are discusse,d in Section II.

2.

The status of unresolved items identified in previous inspection

,

reports is discussed in Section IV.

New unresolved items are identified in Section III of the summary

of the enclosed report.

During the inspection, it was found that certain activities under your

license appear to be in violation of Appendix B to 10 CFR 50 of the

j

AEC Regulations,4" Quality Assurance Criteria for Nuclear Power Plants."

'

The violations and references to the pertinent requirements are identified

in Section I of the summary of the enclosed report.

O

v

,

8004130[zf)

(

-

.

-

-

,

,

V

Arkansas Power and Light Company

-2-

Al)G 1

1973

This notice is sent to you pursuant to the provisions of Section 2.201

of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

.

within 30 days of your receipt of this notice, a written stat ement

~ r explanation in reply including:

(1) corrective steps which have

o

been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the AEC's '" Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

,

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld from public

disclosure. If no proprietary information is identified, a written

statement to that effect should be subnitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

O

and referenced in the application since the application will be placed

V

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Doc . ment Room.

Should you save any questions concerning this letter, we wi3'. be glad

to discuss (. tem with you.

Very truly yours,

I

C

g%rdn

Norman C. Moseley

Director

,

Enclosure:

Inspection Report No.

50-313/73-11

.

s

o

t

!

.