U.C. NUCLEAD RELULATJRY COW'YlON DOCKET N

']

NHC pcnu 196

2. re s NF$C DISTRIBUTION FOR PART 50 DOCKET MATERIAL TL: R.W.

REID FROM:SACRAMEWTO MUNICIPAL DIST.

DATE OF DOCUMENT SACRAMENTO, CALIFORNIA 9-3-76 J.J. MATTIMOE DATE RECEIVED 9-7-76 (3 LETTER O NOTORIZE D PROP INPUT FORM NUMDER OF COPlES RECElVED OCRIGINAL OUNCLASSIFIE D 1

OCory DESCRIPTION ENCLOSU RE LTR. RE. OUR 8-11-76 LTR.....

ADVISING THAT THE ANALYSIS OF THE REACTOR DQyg MOVE COOLANT SYSTEM IS EXPECTED TO BE COMPLETED IN SUFFICIENT TIME TO RESPOND ITHIN THE 60-DAY TIME PERIOD. REQUESTED.....

. ACKNOWLEDGED 1

NED CY. RECEIVED)

PLANT NAME:

RANCHO SECO SAFETY FOR ACIlOB/INEO.RMATION ENVTRO SAB 9-9-76 ASSIGNED Ant l

GOLLER L._._EEMICiLCHT"F

  • REID i__l'ROJECT IfANAGER ROONEY l

LIC, ASST:

INGRAM 1

INTERNAL DISTRIBUTION l

On V T'E.)

i NRrg va KriT.Gli f ROS7TOCZY CHECK C. TR). CELL i

SHA0 P. BAnt.:'C'.1 SKY P. NORIAN R. BOS:MK V. N00:4AN i

l

~ EX TERNAL DISTiliduituJ CONTROL NUcAliER LPDR:

RACRAMENTO. cdT..

9125

""M0 4020Q7

SQ

$sMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 September 3, 1976

[A Director of Nuclear Reactor Regulation mne Attention:

Mr. Robert W. Reid, Chief L

Operating Reactors, Branch 4 es U. S. Nuclear Regulatory Commission 1

g I8/Ib Washington, D. C.

20555 y.

w%

0<

% ew Docket No. 50-312 Rancho Seco Nuclear Generatin y g Station, Unit No. 1

Dear Mr. Reid:

Please refer to your letter of August 11, 1976 wherein you

. requested an evaluation of the susceptibility of the Rancho Seco Unit No. I reactor vessel to overpressurization events.

The Babcock & Wilcox Company has unc'ertaken an analysis of the reactor coolant system to provide the information requested. This analysis should be completed in s'ufficient time for us to respond within the 60-day time period requested.

Sincerely yours, Mb l

J. J. Mattimoe Assistant General Manager and Chief Engineer l