ML19317G581

From kanterella
Jump to navigation Jump to search
Forwards Revision 3 to GAI1811, Effects of High Energy Piping Sys Breaks Outside Reactor Bldg, in Response to AEC & 740429,30 & 0501 Meeting W/Aec as-built Design Mods & Decay Heat Sys Break Reanalysis.W/O Encl
ML19317G581
Person / Time
Site: Crystal River 
Issue date: 06/28/1974
From: Rodgers J
FLORIDA POWER CORP.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003191157
Download: ML19317G581 (4)


Text

O*

AEC DISTI JTTCN FOR PART 50 DOCKET MATER (TCIPORARY FORM)

CONTROL NO:

6053 fit.E : /71/66 FRGM:

DATE OF DOC DATE REC'D LTR TWX RPT OTI2R

~

Florida Power Corporation St. Petersburg, Fla.

33733 J. T. Rodgers 6-28-74 7-3-74 X

TO:

ORIG CC OTHER SENT AEC PDR X

Mr. Giambusso 1 signed X

CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXXX 1

50-302 DESCRIPTION:

ENCLOSURES:

LLr re our 12-15-72 Itr......trans the follow-Revision'# 3 to Effects of High Energy Piping ing:

System Breaks Outside the {teactor Building.

4 M L ne..u u.2*2' Q GAI Rpt #1811 DO Not Remcm

,-.. r-PLANT NAME

Crystal River # 3

( 60 cys rec'd)

FOR ACTION /INFORMATION 7-8-74 AB BUTLER (L) gCIMENCER(L)

ZIDIANN(L)

REGAN(E)

W/ Copies W/ 4 Copies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

DICKER (E)

W/ Copies W/ Copies

'W/ Copics W/ Copies p;.r r.': '.

U.*. 0 41.7 7.VT *.

~TT.

. wit */0)

W/

Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

PURPIE (L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies 7

INTERNAL DISTRIEUTION REG FILC f TECH REVIEW DENTON LIC ASST A/T IND

/ Ati ia HENDRIE GRIMES BRAITMAN CCC, ROCM P-506A SCIIRGEDER GA>DiILL DIGGS (L)

SALT 7J!A'i MUNTZING/ STAFF 11ACCARY KASTNER GEARIN (L)

B. HURT CASE FNIGHT BALLARD GOULBOURNE (L) p-gg GIAMBUSSO PAWLICKI SPANGLER KREUTZER (E)

MCDONALD

~~

d OYD SHA0 MAIGRET (L)

LEE (L)

CHAPMAN v4100R" (L)(EUR)

STELLO ENVIRO DUBE w/ input DEYOUNG(L)(PWR)

HOUSTON MULLER REED (E)

  • ~* COUPE SKOVHOLT (L)

NOVAK DICRER SERVICE (L)

COLLER(L)

ROSS KNIGHTON SHEPPARD (L)

D. THOMPSON (2)

P, COLLINS IPPOLITO YOUNGBLCOD SLATER (E)

/dLECKER DENISE

/TEDESCO REGAN SMITH (L)

ISENHUT sc OPR

/1,0NG PROJECT LDR TEETS (L)

VARGA

  1. CARTER FILE & REGION (3)

LAINAS WILLIAMS (E)

MORRIS E2iAROYA HARLESS WILSON (L) 8003191/ _

KEELE VOLIJiER EXT?RNAL D'STRIEUTION (M

/ - LCCAL FDR Crystal River. Fla.

1 - TIC (ABERNATHY)

(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/*

1 - USIC(EUCHANAU) 1-ASLLP(E/W 31d ;,Rm 320) 1-LIBRARIAF 1 - ASLB 1-W. PE:CiINGTOM, Em E-101 GT SROOKHAVF~

1 - P. R. DAVIS (AFROJET NUCLEAR) 1-CONSULTANT' S 1-AGMEP

/6-CYSACRSHOLDING NETS! ARK / BL5!S/AG3.a.BIAN Ri-B-1-GERALD ULRIK3CN...CRN'.

1-RD..MU.

1-B & M SWINE 3 ROAD, Eu E-201 GT

Rog!at:ry H ~..

vaan j

Fiorida Power aune 28,'1974 C O a P O R A T a0 8e Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing Office of Regulation U.S. Atomic Energy Commitsion Washington, D.C.

20545 In Re:

Florida Power Corporation Crystal River Nuclear Generating Plant Docket No. 50-302

Dear Mr. Giambusso:

Enclosed are sixty (60) copies of Revision 3 to the report entitled Effect of'High Energy' Piping System Breaks Outside Reactor Building,for the Crystal River Unit 3 Nuclear Generating Plant. This report was generated for Florida Power Corporation by Gilbert Associates, Incorporated (GAI) and was in response to your letter of.Ecember 15, 1972.

A meeting was held on April 29, 30 and May 1,1974 with members of your staff at our Crystal River Unit 3 site during which discussions were held concerning the as built condition of the design modifications described in the report and our reanalysis of the Decay Heat System breaks.

j Revision 3,' dated July 1,1974, contains changes to this report to reflect the results of the reanalysis and the final as built design of the modifica-tions to the plant identified in this repor t.

Please contact us if you require any clarification of the above information.

O Verytrulyy)ours,

~

J.T.*/dgersf[: ' f y

cn

[3-6'(( l -

/

tot [

Ro

,/

M 3

S Assistant Vice President l

JTR/csj I -'

  • $ 7

/

enclosure

/

General Office 3201 Thirty-fourtn street soutn. P O Box 14042. st Petersburg. Fonda 33733 e 813-866-5151

Dockst 50-302 July 1, 1974 REVISION 3 Effects of High Energy Piping System Breaks Outside the Reactor Building GAI Report #1811 FLORIDA POWER CORPORATION CRYSTAL RIVER III Revision 3 is a total reprint of the subject report and includes changes made in previous revisions. Caly those changes made subsequent to Revision 2 are indicated by cargin bars.

- Please DISCARD all previous issues of this report (and its revisions) and REPLACE them with Revision 3.

O e

t e