REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIDUTION FOR INCOMING MATERIAL 50-302 REC: REID R W ORG: S1EW4RT W P DOCDATE: 05/15/78 NRC FL Pb,R DATE RCVD: 05/22/78 DOCTYPE: LET'IR NOTARIZED: NO COPIES RECEIVED SUR:!ECT.
LTR 1 ENCL 0 RESPONSE TO NRC LTR DTD 05/02/78.
FURNISHING INFO RE APPLICANT"S SCHEDULE FOR CORE RELOAD, STEAM GENERATOR REPAIRS AND REACTOR RESTART, OF SUBJECT FACILITY.
PLANT NAME: CRYSTAL RIVER H3 REVIEWER INITIAL:
XJM DISTRIBUTOR INITI AL: {,
- o************** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CUDE A001)
FOR ACTION:
BR CHIEF REID**LTR ONLY(7)
INTERNAL:
<EG FILE *LTR ONLY(1)
NRC PDR4'*LTR ONLY(1) m.acTR ONLY(2)
OELD**LTR ONLY(1)
HANAUER**LTR ONLY(1)
CHECK **LTR ONLY(1)
EISENHUT**LTR ONLY(1)
SHAO**LTR ONLY(1)
BAER**LTR ONLY(1)
BUTLER **LTR ONLY(1)
EEB**LTR ONLY(1)
J COLLINS **LTR ONLY(1)
J.
MCGOUGH**LTR ONLY(1)
EXTERNAL:
LPDR'S CRYSTAL RIVER. FL**LTR ONLY(1)
TIC **LTR ONLY(1)
NSIC**LTR ONLY(1)
ACRS CAT B**LTR ONLY(16)
DISTRIBUTION:
LTR 40 ENCL 0 CONTROL NBR:
7019200y4 7
SIZE: 2P f.
/.f
-isg[h
- ooo*******************************
THE END
- r-80031 60100 If f
l
. cog b
teas $
e:
bk
'oce.e "
e Flodda Power
- >ff,"AaAgafci;ga May 15,1978 File: 3-0-3-a-3 Mr. Robert W. Roid, Chief Operating Reactors Branch #4 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Crystal River Unit No. 3 Docket No. 50-302 Operating License No. DPR-72 Florida Power Corporation
Dear Sir:
This is in response to your letter of May 2,1978, which was received by us on May 8,1978. You requested that we submit information as required by Enclosures 1 and 2 as soon as possible, and provide to you within seven days our schedule for submittal as well as for core reload, steam generator repairs, and reactor restart.
Following is a brief sumary of our schedule for thes:-eventsr-12 May Filed response to Enclosure 2, Part II, Item 9 16 May Will file responses to Enclosure 1, Part I, Items 1 through 9 18 May Commence OTLG tube repairs 18 May Commence refueling 2 June Will file responses to Enclosure 2, Part II, Items 1 through 8 and Item 10 2 June Will file Reload Report 3 July Anticipatedunitstartup(breakerclosure)
General Office 3201 Tnuty-fourth street soutn. P.O Box 14042. St. Petersburg. Fionda 33733 e 813-866-5151
l p.
4.
Mr. Robert-W. Reid Page Two May 15,1978
]
We will accelerate our schedule for information submittals whenever i
possible and will be available for further discussion as required.
Sincerely, FLORIDA POWER CORPORATION QB. W /%e W.P. Stewart WPS:QBD: hic 1/25 i