- QC UI3 S,*.CRAMENTO MUNICIPAt UTILITY CISTRICT
~_' 1708 59th Street. Box 15830. Sacramento, Cahfornia 95813:(916)452-3211 December 10, 1974 ep %
N D
o' h
i Director ld Nc%9 s Directorate of Licensing U. S. Atomic Energy Commission
'.y
- po
'4
\\'S
- .h%
Washington, D.C.
20545
- y,(.,
'7/
,x Re:
Operating License DPR-54
't Docket No. 50-312 Abnormal Occurrence A0-50-312-74-ll
Dear Sir:
Power Station, Section 6.12.2B, we are reporting the follAs def co Nuclear occurrence as A0-74-11.
owing abnormal and vented following replacement of the decay heat excha t
ng filled valve.
During the fill and vent procedure, ypass vent valve (SFV-26039) was cycled from 3200 gpm to 2800 gpm.the decay heat exchange throttle the discharge valve were unsuccessful Later attempts to operator revealed that(a tooth had broken from the main drivInspection of the valve object jammed between two adjacent drive gears.') The object e gear and the the main drive gear was replaced and the valve operat was removed, service.
This is the first record of a broken tooth in this type of or was returned to operator.
taken'were satisfactory and in addition a test shThe Plant Review C rective measures the valve operation and stroke times.
ould.be conducted to measure
~
associated with this occurrence.The reactor was at cold shutdow ent was operational and in service during the repair of this valveThe redundant decay hea Respectfully,
<t.t.7 E. x o
J. J. Matticoe Assistant General Manager and Chief Engineer
\\
- Enclosure l
4#h'?$
R. H. Engelken, Region V
,j cc:
2 07EI COPY SENT REGION /
w.
- -- ~,;
s-
,