License DPR-54 for Facility
ML19317F774
Person / Time
Site: Rancho Seco
Issue date: 08/16/1974
From: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML19317F775 List:
References
NUDOCS 8002210537
Download: ML19317F774 (5)


Text

_..

L

, [ ~ ~ h)

LICENSE AUTHORITY FILE C

.: UMTED STATES f'. ' ;k)

ATOMIC E'NERGY CO64 MISSION

~ '

Fje DO NOT 35yoyb mse,,mo~. o.c. -,

t c

N SACIW1 ENTO IUNICIPAL lTTILITY DISTRICT DOClIT No. 50-312 (Rancho Seco Nuclear Generating Station)

FACILITY OPERATING LICENSE

~

~~ ~

License No. DPR-54 1.

The Atomic Energy Commission (the Commission) having found that:

A.

The application for license filed by Sacramento Municipal Utility District (the licensee) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's mles and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B.

Construction of the Rancho Seco Nuclear Generating Station (the faullig) has been subsamcially coinpleted in confonnty with Construction Permit No. CPPR-56 and the application, as amended, the provisions of the Act and the rules and regu-I_)

lations of the Commission; V

C.

The facil_ity will operate in confomity with the application, as amended, the provisions of the Act, and the rules and regu-lations of the Commission; D.

'Ihere is reasonable assurance:

(i) that.the activities authorized by this operating license can be conducted without endangering'the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.

The licensee is technically and financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulations of the Commission;.

F.

The licensee has satisfied the applicable provisions of 10 CFR -

Part 140, " Financial Protection Requirements and Indemnity' Agreements," of the Commission's regulations; G.

'Ihe issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; l

M

,co2 no

+

  • ~.x

. f}

v

H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs

- and'considering availabic alternatives, the issuance of Facility Operating License No. DPR-54,, subject to the con-ditions for protection of the en'vironment set 'forth herein,

is in _accordance with 10.CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D.have been~ satisfied; and I.

The receipt, possession, and use of source, byproduct and special-nuclear material as authori:cd by this license will-be in accordance with the Commission's regulations in 10 CFR Part 30, 40, and 70, including 10 CFR Section 30.33, 40.32, 70.23, and 70.31.

2.

Faci 1ity Operating License No'. DPR-54 is hereby issued to the Sacramento Municipal Utility District to read as follows:

A.

This license applies to the Rancho Seco Nuclear Generating

~ Station, a pressurized water rcactor and associated equip-

~

ment (the facility), owned by the Sacramento Municipal Utinty District.

The facility is located in Sacramento i

County,- California, and is described 'in the " Final Safety

.O-Analysis Report" as supplemented and amended (Amendments 1 throuah 28) ena the environmenta1 Report es surgiemented ena amended -(Amendments 1 and 2).

B.

Subject-to the conditions and requirements incorporated herein, the Commission hereby. licenses Sacramento Municipal Utility District:

(1). Pursuant to Section 104b of the Act and 10 CFR Part 50,

" Licensing of Production and Utilization Facilitie's," to possess, use, and operate the facility at the designated location in Sacramento County, California, in accordance-with the procedures and limitations set forth in this licensc; i

(2) Pursuant to the Act and 10 CFR' Parts 30, 40 and 70 to i

receive,-possess and use at any time any byproduct, source and~special nuclear material as reactor fuel, scaled neutron sources for reactor startup, sealed

-sources for reactor instrumentation and, radiation-monitoring

~

iequipment calibration, and as fission detectors in amounts as required for reactor operation; J

,y

.N.

. r I

q s

._ j

(3)

Purst6nt te.he Act and 10 CFR Part 30 to' receive, r

possess and use at any time 100 millicuries cach of any byproduct material uithout restriction to chemical or physical fom, for sampic analysis or instrument calibration; O

M (4)

Pursuant to the Act and 10 CFR Parts 40 and 70 to receive, possess and use at any time 100 milligrams each of any source or special nuclear material without restriction to chemical or physical fom, for sample analysis or instrument calibration; (5)

Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special m --

'~

nucicar materials as may be produced by the operation i

of the fa'cility.

3 C.

'Iltis license shall be deemed'to contain and is stibject to the

~

conditions specified in the following Conmission regulations in 10 CFR Chapter I:

Part 20, Section' 30.34 uf Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all. applicable pro-visions of the Act and to the rules, regulations, and orders of the Comission now or hereafter in effect; and is subject to the additional conditions specified or incorporated belcw:

j,,e'2(1), Maximum Power h

W 'Ihe licensee is authorized to operate the facility at a

~

~

0-i

%.;h, i. {.g(

f gv

' ~2772. megawatts thema1.

{'

steady state reactor core power level not in excess of g

-,y (2) Technical Specifications _

e The Technical Specifications contained in Appendices A and B, as revised through Amendment No.2 f, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) The licensee shall maintain in effect and fully implement all provisions of the Comission-approved h*.

physical security plan, including amendments and pN changes made pursuant to the authority of 10 CFR p

50.54(p). The approved security plan consists of documents withheld from public disclosure pursuant M,79 to 10 CFR 2'.790(d), referred to as Rancho Seco Nuclear Generating Station Physical Security Plan dated October 14, 1977, as amended December 28, 1977, May 10,1978, October 3, 1978, November 17, 1978 February 2,1979 and February 22, 1979.

h

[

.t.

O (4) The licensee ray proceed with and is recuired to complete the modifications identified in Paragraphs 3.1.1 through 3.1.40 of the fiRC's Fire Protection

[41M.,c25 Safety Evaluation (SE) on the facility dated February 28. 1978 and supplements thereto.

These I

modifications shall be completed as specified in p,,y_g Table 3.1 of the SE or supplements thereto.

In p.

addition, the licensee shall submit the additional information idsntified in Table 3.2 of this SE in accordance with the schedule contained therein.

In O-the eveat these eetes >or submittai c nnot he met.

the licensee shall submit a report, explaining the circumstances, together with a revised sch5dule. ~

(5) The licensee shall perform the supplementary inserviceI 1

tests and inspections of Nuclear Class 2 and Class 3 f

f i

systems and r"mponents conmitted to in the letter of UCd J'

February 27, 1978, from J. J. Mattimoe to R. W. Reid.

[c-)-

(6)

In accordance with the pros.sions of 10 CFR 50.12(a) an

[plh 8

exemption from the provisions of 10 CFR 50.55a(g)(4)(v) is granted, and the effective date for the start of the 5 7F next 40-month period is extended from August 18, 1978 to October 18, 1979.

i_

I i

i (O

i e

7" O

D.

'ntis license is subject to the following additional' condition

]

, for the protection of the environment:-

If harmful effects or evidence '6f irreversible damage are detected by the r.onitoring prograns included in the Tec'mical Specifications (Appendix E), the Applicant Will provide an analysis of the problem and a proposed course of action to alleviate the probica.

E.

This license is effective as of the date of issuance and shall expire at midnight, October 31, 2008.

~

~

~

FOR TIIE ATG11C DERGY CGG11SSION

--O c izie 1 str#ce dr Re:ct,1 E d.

A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing

Attachment:

Appendices A and B - Tecimical Specifications Date of Isa mnce: