ML19317F584
| ML19317F584 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/18/1977 |
| From: | Heishman R Office of Nuclear Reactor Regulation |
| To: | Roe L TOLEDO EDISON CO. |
| References | |
| NUDOCS 8001150906 | |
| Download: ML19317F584 (1) | |
Text
- - - - - _ _ _ _
w O
CENTRAL FILES 4 %.
~
s-i I
E
[
Dockot No. 50-346 j
SER 181977 Toledo Edison Company ATTds Mr. Lowell ;;. Fwa
[
Vice Presidcat Facilities Deve.1.cpment Edison Plaza 30011adison Avenue Toledo, OH 43652 l
Gentlemen:
Thank you for your final report dated April 4,1977, pursuant l
to 10 CFR 59.55(e) retarding Wectin;; house l'otor control Center i
400 mup stab We completed our review of this matter during the inspectic,a conducted April 5 -6, 1977, and have no further questions regarding this matter.
Your cooperation with us is appreciated.
Sincerely, R. F. IIcishmnn, Chief Reactor Construction and Engineering Support 3 ranch cc v/itr dtd 4/4/77:
Central Files Reproduction Unit tiRC 20b PDR Local PDR USIC TIC I
U. Young Park, Power l
Siting Com:aission
/Y berie s,-
RIII.
_RLII
.f RIII)
- RIIT, R h'7s r Wibr4Mb s
He s aan No bs Kepkcr mva.. >
b'ava >
. 4_f_J 4 / 77 t/[pfh]_
l NRC FORM SIS (9 76) NACM 0240
- -Wu.s.sovem=mant rainnne orricas s 44
.-w gcw--y-