Text
-
EC t Unv ",03 v.s. NUCLi. An nr UUt. Af 0ftY CC 4510t4 DOCKf I NUMBE R 50 146 u ses.
e NRC DISTRIBUTION run PART 50 DOCKET MATERIAL TO:
ritOM:
DAtt or ooCUMcNT Toledo Edison 8/25/76 Mr. John F. Stolz Toledo, Ohio csArt ntCeivco Mr. Lowell E. Rowe 8/28/76 NL.c tra n ONoronizeo enor iNeurponu N,uuutsi or Corics sitCeiveu
,. Mu NC LASSt rlE o One signed
- lolN AL corv UCScnirTION ENCLOSURE Ltr. re our 5/21/76 ltr...concerning the design of reactor pressure vessel support systems on Unit 1.
(2-P)
PIANT NAME:
Davis Besse DISTRIBUTION FOR REACTOR PRESSURE VESSEL INFO FOR NON-OPERATING REACTORS PER H. SMITH 6-18-76 SAFETY FOR ACTIONilNFOR.'.1 ATION 8/31/76 RJL
[ ASSIGN.{D AD_:
I Vassallo l
K. " 3_.'.':01: C:!EF:
Stolz
/ FROJECT !!ANAGER:
g;*,Engle N LIC ASST:
Hyl ton I f X ACRS/(3 CYS SENT CATECO:1Y B
^
INTERNAL DISTRIBUTION
_C RFC FITD i E C f 03_.
X,_ R I & E_,[2) k F. UTELTA"5 (LTR Om Y1 R'p_'p_^ ELD _(LIA.ETLYi IRCA o
u.
@,g &TD_(LTR CNLY)
EEIHEMAN
_SCHROEDER i.- x rmt?
"\\CCARY g'_ROSS
_.TED_E S_C0 NOVAK I) / OSZTOCZY
[
It EIIIAS 6
EXTERNAL DISTRIBUTION CONTROL NUMBE R l, LPDR; Part Clinton.Oi tio i
'ill 77+'/
C TOLEDO
%ms EDISON
/
LOWELL E. RCE f
v.c. %,.o.e Docket No. 50-346 e
- =+ = o- =~ c mei ass-sa4 August 25, 1976 4
['
~
Ser. No. 106 s? ' C. [/ ;-)
,+m 2
f.
y c~
t;7 j@fj y,f;ts }1 Director of Nuclear Regulation
[
Attention:
Mr. John F. Stolz, Chief
.c-q Lightwater Reactors Branch (1)
(,'
INEs*b Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.
20555
-se [
Dear Mr. Stolz:
Resulting from Mr. W. R. Butler's May 21, 1976, letter received May 25, 1976, concerning the design of reactor pressure vessel support systems on Davis-Besse Unit 1, The Toledo Edison Company with cooperation from its Architect Engineer and NSSS vendor has developed a tentative schedule for performing the analyses which would be required to respond to the request attached to Mr. Butler's letter.
The following schedule represents a potential approach based upon a detailed, systematic analysis of the Davis-Besse Unit 1 specific reactor vessel support system.
It must be emphasized, as indicated below, that Toledo Edison is continuing to evaluate alternative approaches to the identified NRC concerns, and at this tLse does not consider this schedule to be a commitment of this project.
Milestones for the tentative schedule are as follows:
1.
Begin mobilization and scope clarification 7/1/76 2.
Initiate program activity 9/1/76 3.
Break location and break sizes determined 8/15/77 4.
Mass / energy release rates determined 11/15/77 5.
Cavity and core aP determined 1/15/78 6.
Support loads and cavity stresses determined 9/15/78 7.
Support loads evaluated and results submitted to NRC 3/15/79 Should any problems be encountered which would rcquire sdditional iter-ations in the acalyses, an additional year may be required for the final evaluation and results.
374'.
THE TCLECO ECISON CCMPANY EDISON PLAZA 300 MACISCN AVENUE TCLEDO. CHIO 43652
-~
4
-e" Mr. John F. Stolz Fage 2 August 25, 1976 It is evident that such an extensive evaluation program would take over two and one-half years, and the cost of analytical work alone would approach $1 million.
We are continuing to review alternatives to addressing this study with other B&W NSSS users in order to take maximum advantage of generic aspects of the study; changes to the above schedule may result from this effort. As our approach to the study materializes, we may be contacting I
you or your staff to jointly review our plans in order to assure that the f
studies we perform will alleviate your (.oncern regarding the adequacy of the Davis-Besse Unit 1 reactor vessel stpport system.
With the concurrence of your Licensing Project Manage;, we have deferred our response to Mr. Butler's letter in order to take advantage of a users group meeting scheduled after the requested response period.
Sincerely, Lowell E. Roe Vice President Facilities Development LER.r