JUN 2 B75 P. Schroeder, Acting Director, Division of Technien1 Review
~
TECINICAL ASSISTA:lCE REQUEST NO. ORB-1-159 Your assistance is requested for the following:
Pl&T NA'!E:
Oconce Nuclear Station, Units 2 4 3 DOCKET NOS. :
f([ ORB-1 50-270 6 50-287 RESPO::SIbLE DRANCII:
CO; TACT:
TECiCi1 CAL REVIEW BRA';C11ES:
C. H. Tranne11 (x-7434)
Core Perforaance Branch Reactor Systems Eranch Mechanical Engineerin; Dranch l
DESCRIPTIO!i 0F REQUEST:
Measurenents at Oconca Units 2 and 3 indicate that reactor coolant flow exceeds design by about 11'4.
Iligher than design flow could cause several fuel cic=ents to lift under the influence of the higher core pressure drop.
By Transfer of Lead Responsibility Ictter dated May 23, 1975, the Office of Inspection and Enforcenent has requested Reactor Licensing to evaluate the increased flow to deternine if any safety problem exists.
According to safety analysis subnitted to IE:II by 3GW on May 2,1975, the postulated lifting of fuel clenents does not constitute an un-reviewed safety question.
Duke Power Congany's amplifying letter of }hy 23, 1975 (transnitting Unusual Event Renort UE-270/75-7) discusses t:1e results ' f measure-o ments made to detect sli ht fuel elenent lifting.
d No lifting was evident.
Technical Revicw is requested to review these reports (copics of which are enclosed) for acceptability and provide a written evaluation of the results of their review.
O'hhf
)
1 orrect >
oun=awa k l'
DAfa b
=
i 9001140
t1
. F. Schroeder JUN 2 B75 Any additional information or corrective action needed should be promptly identified since both units are currently operating with-out restrictions associated with the higher coolant flow.
June 23, 1975 TARGET DATE FOR C0!!PLET10M:
Original signed by:
Robert A. Purpie Robert A. Purple, Chief Operating Reactors Branch #1 Division of Reactor Licensing 1
1 23, 1975
Enclosures:
Transfer of Lead Responsibility 1ctter dtd !!ay
?!cno, F. J. Long to 11. D. Thornburg dtd May 6,1975 1.
2.
Safety Analysis from BGW dtd May 2, 1975 3.
4.
Duke 1tr dtd !!ay 23, 1975 5.
Duke 1tr dtd Nove:sber 26, 1974 6.
Duke 1tr dtd April 1, 1975 cc w/ enclosures:
D. Ross T. Novak J. Knight DISTRIBUTION Docket Files ORB #1 Reading KRGoller RAPurple CTrammell SMSheppard SVarga fi D
DRL:0RB81 DRL:0RB#1
~
de e.c. e CIla.GDe.lllbk
_.RAPurple
- vaw *
.- > > 5L30L25
_5L 115.~
i
__. _