Text
AEC DISTRIBUTIOil FOR PART 50 DOCKET MATERI AL 97 (TDiPOP.ARY FORM)
CONTROL NO:
FILE:
FROM:
DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Duke Power Comp 1ny charlotte, N.C. 28201 12-26-73 1-3-74 X
A. C. Thics TO:
A. Giac.busso 1 signed SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT NO CiS REC'D DOCKET NO:
XXX 1
50-270 DESCRIPTION:
ENCLOSU%3:
Ltr furnishing info regarding Start up Test Program, re 12-22-73 waiver request, advising g gT(
,$1U ViS 3
reactor power didnot exc e ed 7 57...............
ACKNOWLEDGED PLANT NAME: Oconee Unit #2 FOR ACTION /INFORMATION 1-10-74 GC BUTLER (L)
/SCIMENCER(L)
ZIH4 ANN (L)
REGAN(E)
W/ Copies W/ 9 Copies W/ Copies W/ Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
D11GHION(E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHD4EL(L)
YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies INTER';AL DISTRIBUTION j
MMTD TECH REVIEW DENTON A/T IND g#
LIC ASST AEC PDR HENDRIE GRIMES BRAIIMAN i
b'DGC, ROOM P-506A SCHROEDER CAMMILL DIGGS (L)
SALTZMAN MUNIZING/ STAFF MACCARY KASTNER JEARIN(L)
B. HURT CASE Di1GHT BALLARD V GOULBOURNE (L) pgg GIAMBUSSO PAWLICKI SPANGLER LEE (L)
MCDONALD BOYD SHAO MAIGRET (L)
MOORE (L)(BWR)
STELLO ENVIRO SERVICE (L) vDEYOUNG(L)(PWR)
HOUSTON MULLER SHEPPARD (E)
IhTO SKOVHOLT (L)
NOVAK DICKER SMITH (L)
C. MILES ROSS D11GHTON TEETS (L)
B. KING P. COLLINS,
IPPOLITO YOUNGBLOOD WADE (E) witEGOPR TEDESCO REGAN WILLIAMS (E)
FILE & REGION (,'Q LONG PROJECT LDR WILSON (L)
MORRIS LAINAS DURHAM (E)
STEELE BENAROYA HARLESS kk VOLU4ER EXTERNAL DISTRIBUTION (l LJf VI - LOCAL PDR Walhalla, S.C.
/1 - DTIE(ABERNATHY)
(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY
./1 - NSIC(BU'CHANAN) 1-ASLEP(E/W Bidg,Rm 529) 1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/
1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST.
1-CONSULTANT' S 1-AGMED(Ruth Gusscan:
j16-CYSACRSEDLDINE SENT TO LIC. ASST.
NEVMARK/BLUME/AGBABIAN Ri-B-127. GT.
1-10-74 COULBOUNREl-GERALD ULRIK' ION...ORNL 1-RD.. MULLER..F-309 (
8001140 7 7/
[
~
e 5..
DUKE POWEn COMPANY E0gt!lal0PJ 080Ie 3d C
rowza nuiu>ixo 422 SouTu Cucacu STazzT, CH Anf.DTTE, N. C. esaos A. c. nu zs P.o. Box 2ne Stee oe wet Persect t w.o
..o 3........
December 26, 1973
/G
\\"
py
/ \\,J'
/
k
}-
g Mr. Angelo Giambusso
/ ';
3M(
Deputy Director for Reactor Projects y9 Directorate of Licensing Office of Regulation g[3 I
. -m W U. S. Atemic Energy Commission
/-
Washington, D. C.
20545
'i Re: Oconce Nuclear Station Unit 2 Docket No. 50-270
Dear Mr. Giambusso:
Oconee Nuclear Station Technical Specification 3.5.2.5(e) requires that reactor power imbalance be maintained within the envelope defined by The Unit 2 startup testing program requires the excore Figure 3.5.2-3.
detectors to be calibrated at 75 percent power with the imbalance outside the envelope defined by Figure 3.5.2-3.
On December 22, 1973, Duke Power Company requested, by telephone, permission to exceed the' imbalance limits in Technical Specification 3.5.2.5(e) (Figure 3.5.2-3) for the purpose of completing physics tests required to calibrate the Unit 2 excore This waiver was granted on the same date by Mr. I. A. Feltier detectors.
of your staff. As a condition of the waiver, quadrant tilt was held at less than 4 percent while the imbalance limit was exceeded, and reactor power did not exceed 75 percent.
Very truly yours, A. C. Thies ACT:vr S
'd wac j
UM8 197p b E
d m
m 37 c