ML19317F465

From kanterella
Jump to navigation Jump to search
Forwards RO-270/77-05
Date released: 11/27/2019 Download: ML19317F465


RO 270/77-05:on 770329,during Control Rad Movements Test Rod 2 Group 1 Dropped Into Core,Causing Reactor Quadrant Tilt Limit to Exceed Tech Spec Requirements.Caysed by Failed Control Rod Drive Stator Fuse.Fuse Replaced
ML19317F473
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/28/1977
From:
DUKE POWER CO.
To:
References
Download: ML19317F473 (2)
Forwards RO-270/77-05
ML19317F464
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/28/1977
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F464 (1)