Discusses 720225 Telcon W/B Pollard Re Comments & Questions on Facility Review Plan.Provides List of Problems Not Critical to Schedule
ML19317F455
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/28/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001140690
Download: ML19317F455 (2)


Text

b o -- 4

/U M %'b Q I

NOTE FOR FILES Bob Pollard, DRS, called Friday, February 25, 1972, with the following coments and questions on the Oconee Units 2 and 3 Review Plan:

Item 3.11 Single rod withdrawal is not feasible in Oconce and therefore consequences do not need to be evaluated.

Item 6.2 Position on interlocks on isolation valves in the core floodine tank lines was waived for Oconee Unit 1 but Units 2 and 3 l

should meet the requirements of the position paper. This should not be an asterisk item.

Item 6.9 What was meant by this item? DRS currently working on guide to cover systems to detect failures dt inoperability of safety systems M 7 1 ant is in normal operation. This was our intent on this review item, I believe.

Item 7.6 Why isn't this an asterisk item? Because of the cable tray experience in Unit 1 and corrective changes to take place in Units 2 and 3.

M I. A. Peltier cc:

A. Schwencer I. Peltier l

m.o

.. e

""0 111o gpo g

, FEB Z 8 git Problems Not Critical to Schedule 1.

New Rules on Fracture Toughness - Af fects Oconee Unit 1 on low power physics tests directly. Iby affect Unit 2 later.

2.

Numerical Guides for " Low as Practicable" -

May affect Tech Specs and Operating Procedures.

3.

Industrial Security Plan from Applicant needed during review period.

4.

Crew Size - DRL position firm but applicant has not agreed.

5.

Cable Problem Applicant has not as yet revised FSAR for correction to cable tray fill problem experienced in Unit 1.

6.

Rod Drop Time Problem - Applicant does not agree with tech spec minimum rod drop time specification proposed by DRL.

7.

Fuel Surveillance Program - Applicant wants guidance on what will be required of them in order to expand the surveillance program.