Discusses 721221 Telcon W/Util Re Steamline Break Analysis
ML19317F348
Person / Time
Site: Oconee 
Issue date: 12/22/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001100721
Download: ML19317F348 (1)


Text

[()

c A 63 ' /

~

2 2 YD1 DEC NOTE FOR FILES

.TELECON WITH W. S. LEE, SENIOR VICE PRESlDENT, ENGINEERING CONSTRUCTION, 21, 1972 DUKE POWER COMPANY, REGARDING STEAMLINE BREAK ANALYSIS - DECEMBER Earlier today I placed a call to Mr. Thies, Vice President, Production-Operations, Duke Power Company, to alert him to the need for upper management attention to the safety concern over main steamline and main feedwater line Mr. Thies was not ruptures outside the Oconee plants containment building.

available and could not be reached, but Bill Lee called me back and I gave He said he would get together with Mr. Thies when the information to him.

he became available.

I Essentially, I pointed out that this postulated accident was going to receive a full review by Licensing and that Duke should take its own operating schedules into consideration in its response (within seven (7) days of receipt of the 12/15/72). In particular Duke should not assume that steamline letter dtd review and modification of any of the Oconee Units may take place af ter licensing decisions of that type'can only he made on the and power operation, since basis of the findings relative to this safety issue.

Since Lee recognized the urgency and appeared to understand the implications.

basically, this falls in his area of responsibility he indicated that top management would give appropriate attention to the matter.

yNV,A I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc: