05000270/LER-1977-012-01, /01X-0:on 770927,primary to Secondary Leak Found Coming from 2B once-through Steam Generator.Cause Undetermined.Leak Plugged

From kanterella
(Redirected from ML19317F329)
Jump to navigation Jump to search
/01X-0:on 770927,primary to Secondary Leak Found Coming from 2B once-through Steam Generator.Cause Undetermined.Leak Plugged
ML19317F329
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/07/1977
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19317F325 List:
References
LER-77-012-01X, LER-77-12-1X, NUDOCS 8001100704
Download: ML19317F329 (7)


LER-1977-012, /01X-0:on 770927,primary to Secondary Leak Found Coming from 2B once-through Steam Generator.Cause Undetermined.Leak Plugged
Event date:
Report date:
2701977012R01 - NRC Website

text

~

~

. f-Q v

DUKE POWER Ont!'A!W OCONCE Ut;IT 2 Report Number:

R0-270/77-12 Occurrence'Date:

October 7,1977

. Report Date: February 15, 1978 Facility:

Unit 2, Seneca, South Carolina Identifica' tion of Occurrence:

Primary-to-Secondary Leak through B

~

Once Through SteamcGenerator (OTSG)

Conditions Prior to Occurrence:

80 percent Full-Power Description of Occurrence:

' On September 27, 1977 air injector radiation monitor RIA-40 indicated a primary-to-secondary Icak of approximately 0.2 gpm.

Power was reduced to 67 pc.rcent to ' reduce powdex contamination. Subsequently, because of an apparently incrcasing Icak rate the unit was shut down on

~

October 7, 1977.. Af ter a 21 day outage and several unsuccessful attempts to find the leak the unit was -returned to power operation on October 28, 1977. A second unsuccessful attempt to-locate the leak was made from November,3 to 12, 1977.

On December 29, 1977 the unit was shut down to repair a-_ control rod stator, remove install.ed steam generator instrumentation 'and make -another attempt at 17 ocating the indicated leak.

b

.Tu e-77-25 was discovered to be leaking. Fiber optic and eddy-current examinations indicated a 90 circumferential' crack near.

the upper tube sheet. The tube;was stabilized and plugged.

The instrumented ' tubes (6), which showed considerable wall thinning, were also plugged A11 -(7) previously plugged tubes were re-plugged as a precautionary measure., Hydrostatic tests showed no further Icaks and the unit was-returned to power operation on January 16, 1978.

~.

Apparent Cause of.0ccurrence:

The exact cause of_tlue incident cannot be determined. The primary-to-secondary 11cak could have been _ caused.by either' tube 77-25 or any of the:seven replugged. tubes. The Nucicar Steam Supply System supplier, Babcock 'and Wilcox, and Duke Power Company are continuing to investigate the ' tube. leak problem. '

1 O

- m 6

Gi J

f; s

'80.01100 ] o

DI KE l'O',il:R Co*tt'ANY OCONCE UNIT 2 (Cont'd)

Analysis of Occurrence:

All liquid and gaseous waste releasts were controlled and accounted for within applicabic criteria.

Plant personnel exposure totalled 11.48 man-rem.

The reactor coolant boundary was re-established by the tube repair. Therefore, the health and safety of the public were not endan-gered.

Corrective Action

Tube 77-25 was stabilized and plugged.

Previously instrumented tubes which showed appreciable wall thinning were also plugged. All pre-viously plugged tubes were re-plugged.

5 4

9 e

t 4.

.1 SUMMARY OF HAJOR OTSG TUBE EXPER1ENCE AT OCONEE~

.# TUBESLEXAMINED

GENERATOR ROR. TUBE

. ELEVATION 1DATE TUBE. LEAKER CONDITION ACTION RO#

(excludes.. leakers)

LANE.

1-AL

'7 7 '

.17j Tubesheet

~10/31/76 Yes

'ths

. Crack Plugged

' R0-269/76-17 153 1-A 77 18 Tubesheet.

10/31/76 Yes-No

. Distorted Eddy Plugged Current Signal 1-B 114. 109-14th. Plate 12/8/76 No Yes No Visual

' Nailed-R0-269/76-19 139 Inspection 1-B 113 115 14th Plate 12/8/76 No No Distorted Eddy-Plugged Currant Signal 1-B 113 110 14th Plate 12/8/76 No No Similar to Nailed 114/109 1-B '

75 18 Tubesheet 12/8/76 Yes No 300 Crack Nailed

1-B

'75 12

.Tubesheet 1/15/77 Yes Yes 350. Crack Nailed R0-269/77-2

'140 1-B 81 128 Tubesheet 1/15/77 RNo No Eddy Current Nailed Indication 1-B 32 13 14th Plate 2/28/77 No Yes Eddy Current Nailed RO-269/77-8 3%

I.ndication 1-B 33 14 14th Plate 2/28/77 No No Eddy Current Nailed Indication 1-B 77 25 14th Plate 2/28/77 Yes No Eddy Current P.emoved Indication 1-B 2

7 13th Plate 2/28/77 No No Eddy Current Plugged Indication 1-3 2

8 13th Plate 2/28/77 No No Eddy Current Plugged

~

Indication 1-B 101 40 4th Plate 2/28/77 No No Eddy Current Plugged Indication

_ _1._

~

SUMMARY OF MMOR OTSG TUBE EXPERIENCE AT OCONEE (CONT'D).

  1. TUB'ES EXAMINED LANE l GENERATOR ' ROW, TUBE.

ELEVATION

DATE TUBE LEAKER CONDITION ACTION

. ROP (excludes leakers) 1-B -

77-25 Tubesheet 3/22/77

.Yes Yes Weld Crack Replugged R0-269/77-11 100 1-BL

.77 3,5,8' ---

.3/22/77 Yes 1No Distorted Plugged Eddy Current

- Signal 1-B.

77 15.

Tubesheet 5/7/77 Yes Yes Crack Plugged R0-269/77-16 507 Removed 5/7/77 Yes No 1-B

!77 ~

18 5/7/77

- No

~No Distorted Plugged 1-B

' 17 5

Eddy Current Signal 2-B 77 23 Tubesheet 12/4/76 Yes Yes 270 Crack, Removed R0-270/76-15 133 Hole 2-B 77-27 15th Plate 12/4/76 Yes No Wear Appearance Removed 2-B 124 42 12th Plate 12/4/76 No No Eddy Current Flugged Indication, 40-60%

2-B 118 52 12th Plate 12/4/76 No No Similar to Left 124/42, 15%

3-8 77 11 15th Plate 7/21/76 Yes Yes No Visual Plugged R0-287/76-10 9

Inspection 3-B 77 19 15th Plate 2/14/77 Yes

.Yes Eddy Current Nailed R0-287 /77-2 142 45 Crack L3-8 77 12,13,14,15 2/14/77 Yes No Eddy Current Nailed 16,17,18,20, 21 3-B 75 2

2/14/77 Yes No Eddy Current Nailed

m CONEE'(CONT'D) k--

SUMMARY OF MAJOR OTSG TUBE EXPERIENCE AT O

'# TUBES EXAMINED '

(excludes leakers)

LANE ACTION

- RO #

_. '..j

~

TUBE JLEAKER CONDITION ELEVATION DATE

- GENERATOR'. ROW, TUBE q.

133 JRO-287/77-8' 3-B T78' 1

f15th Plate-' 6/10/77' No Yes. ~90 Crack 6-1/8" Nailed.

longitudinal B..

77 2

Tubesheet 7/14/77-Yes Yes 60 -90 ' Crack Nailed R0-287 /77-10

'120 Nailed' 7/14/77 Yes

.No 2-B

,77 25' Tubesheet 1/14/78 Yes Yes 90 Crack Nailed

' R0-270 /7 7 :3-B.

. 77 1-1/14/78-Yes No Eddy Current Plugged Indication, SOAK 2-B 75 - 21 Plugged 1/14/78 Yes No Eddy Current Indication, SOAK B 77 4

1/14/78 Yes No Eddy Current Plugged Indication, SOAK 2-B-77 18 1/14/78 Yes No Eddy' Current Plugged Indication, SOAK 2-B 77 19 1/14/78 Yes No Eddy Current Plugged Indication, SOAK 2-B 77 21 1/14/78 Yes No Eddy Current Plugged Indication, SOAK 2-B 78 4

Y e

O A

... +.N.nes w.-

- m.

.eembaspee 4e p e -

=>w

= w

.ese

e. e a U. S. Nuct EAR n g cutAT OMY Ceuuse,e, icy EXHIBIT A N aC FOR*d y,4 LICENSEE EVENT REPORT 111H tettA s raWT OR TYPE ALL RECUIRED 14 FCAV AfiCW CcNTmot stocit: 1 I

l l

l l j@

4lll11111]@l j. lg 01 01 -1010101 010 l 101 0] @ 3 i

$7 0.A 7 se yCgt.sg tyrt JO lo lil in i e I n i elv 12j@16 JS UCt%gg nuassEM

) 7) 8]@

14 7

8 9 UCteette COQ (

l O I s i Ol0 1012 l 710.Ol_1 10 l O l7 17 I 7 ]@[0 3

73

..,r y o.n cose*T lolil Md Evt r e rt f

occ. r,,u n.

h ified as coning 3

EVENT DESCmFTION AND PRCS A8L$ CONSECUE**CESa primary-to-secondary leak wa e

e l_On September 27. 1977 down on October 7 for 21 days but the j

o 2 QJ 2] I f rom the 2B OTSG. ' The unit was shut was begun on j

Another unsuccessful shutdown l_ leak could not he located.

d stator the y

During an unscheduled outage to repair a control ro o 4 lo1511 November 3.

13 other tubes were y

1eak was located an (the Icaking tube was plugged.

(see

@l This is the 13th OTSG tube Icak at Oconee

@ l_niunood or renlunned.

h d by the repairs.

J i

attached). _The RC boundary was re-establ s e c

v.tv e su a..

stecces QJ a j 1 cces scaess c

c:ureusvt: ce I,c 1 c l@ l,Ej@ [u _J@ l 11l Tl E I X l Cl 11]@ W sistiu causs Cece cces coes 3

i.

o aCYt tic 8e.

u i.

i OCCUAst%CE mtPCMT o s

.a

$20Vi=T1 AL coes n

h,"uarao !_avtur ve>a l-.-]

10 I 1 l 2l y

10l 1l W

[---j y

aircat =o.

2r

s sa n

u j,y,,, L :.7 l 7l l

. e z.=w.t:x.. r.:mr

. x : m ::,,

u a

2

s LE.,jhl.X3 LAdh L. Aj@

l 018l9 l 3 )

[lj@

[Lj@

(N_j@

In101115]@

: = @ a::

c r a.

u@

The corrective action,

=

m u

CAcss cesemencN ANocometenvt AcncNs g i The cause of OTSG tube leaks at Oconec is undetermined.

t d tubes.

Future g

the olunninn of leaking or previously instrumen e i l_taken was 3

i gj l_ action will be determined by research now in progress.

1 1

L1.LLI l-art I

E, CISCOVf RY OESCneFT1Gre l

  1. 34 0 R l A [_jhI_ Onor, tor Observat ion CTMEM TTATUS

%Po*E4 so ATVS l 01 81 d @ l___

'NA 3 lEj@ Srsvr tectrica ce.ett,se @

assovat oc acnvnv h i

8,jnvny c

=etresso o* = stress J

l s^

80 8 L2J@ L2!el

=

' ' eenscu 'e*6 xposO ts eticanevo= @

j l_016l9]@d@l_ Total exposure of 11.48 man-rem during t nas

=vuna

=

8 7

,1..c,. d'..uv'.'.,u

[

0tScmitt1CM esunsea m to fiTal l_ ni ol0j@l nA n

naCE To eaciuty I

4033 Cs om ca het Ct50p6p T10te llJ.2J t,_2J@l-ur-NAC USE cNLY j

liiiiiiiiiiii e

io fit 51 L.xl@7"3c,,ne;h33y,'"*"l Erel,,n,t i nn of unscheduled outanes I

(704) 373-8197 i

sauscrencrrasn_K. R. Wilson

, s cu,,

e ee is