ML19317F279
| ML19317F279 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/01/1976 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19317F274 | List: |
| References | |
| NUDOCS 8001090612 | |
| Download: ML19317F279 (3) | |
Text
. - _ - _.
O UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-287 DUKE POWER COMPANY NOTICE OF PROPOSED ISSUANCE OF AMENDMENT 10 FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (the Comission) is considering the issuance of an amendment to Facility Operating License No. DPR-55, issued to Duke Power Company (the licensee) for operation of the Oconee Nuclear Station, Unit No. 3 (the facility), located in Oconee County, South Carolina.
The amendment would modify operating limits in the Ocenee Technical Specifications based on the analyses conducted for the Unit No. 3
~
cycle 2 reload.
Changes in the analyses include (1) the use 'of the B&W-2 Critical Heat Flux (CHF) correlation rather than the W-3 correlation' (2) the use of measured rather than design flow in the thermal-hydraulic analysis, and (3) elimination of the reactor vessel vent valve flow penal ty.
Prior to issuance of the proposed license amendment, the Comission will have made the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the, Comission's rules and regulations.
OcI By Jgg the licensee may file a request for a hearing and any person whose interast may be affected by this proceeding may file a request for a heari..g in the fonn of a petition for leave tc intervene
.4 g o o 3 n gn g/2 -
, with respect to the issuance of the amendment to the subject facility operating license. Petitions for leave to intervene must be filed under oath or affirmation in accordance with the provisions of Section 2.714 of 10 CFR Part 2 of the Comission's regulations. A petition for leave to intervene must set forth the interest of the petitioner in the l
proceeding, how that interest may be affected by the results of the i
proceeding, and the petitioner's contentions with respect to the proposed l'
licensing action.
Such petitions must be filed in accordance with the provisions of this FEDEP.AL REGISTER Notice and Section 2.714, and must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory s
Comission, Washington, D.C.
20555, Attention: Docketing and Service Section, by the above date. A copy of the petition and/or request for a hearing should be sent to the Executive Legal Director, U.S. Nuclear Regulatory Comission, Washington, D.C.
20555 and to Mr. Troy B.
Conner, Conner & Knotts,1747 Pennsylvania Avenue, NW., Washington, D.C.
20006, the attorney for the licensee.
A petition for leave to intervene must be accompanied by a supporting affidavit which identifies the specific aspect or aspects of the proceeding as to which intervention is desired and specifies with particularity the facts on which the petitioner relies as to both his interest and his contentions with regard to each aspect on which~ intervention is requested.
l Petitions stating contentions relating only to matters outside the Comission's jurisdiction will be denied.
E 4 %'
., i All petitions will be acted upon by the Commission or licens f the Atomic board designated by the Comission or by the Chainnan o Timely petitions will oe considered I
Safety and Licensing Board Panel.
ther appropriate to determine whether a hearing should be noticed or ano order issued regarding the disposition of the petitions.
l d to In the event that a hearing is held and a person is permitte ht to intervene, he becomes a party to the proceeding and has a rl' For example, he l-j k
participate fully in the conduct of the hearing.
[
i ses.
may present evidence and examine and cross-examine w tnes i
tion For further details with respect to this action, see the app lic which is available for pub 21, 1976, for amendment dated July 7 H Street, NW.,
inspection at the Comission's public Document Room,171 Spring Washington, D.C. and at the Oconee County Library, 201' So Street, Walhalla, South Carolina.
1st day of September 1976.
Dated at Bethesda, Maryland, this FOR THE NUCLEAR REGULATORY CO
(,4 & &
A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors l7M l