ML19317F241

From kanterella
Jump to navigation Jump to search
Forwards AO-287/75-02
Date released: 11/27/2019 Download: ML19317F241


AO-287/75-02:on 750205,during Maint Shutdown,Unsuccessful Attempts to Open Valve 3LP-18 Revealed Fuse Failure in Control Power Transformer.Caused by Either Voltage Surge or Defective Fuse.Blown Fuse Replaced
ML19317F243
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/09/1975
From:
DUKE POWER CO.
To:
References
Download: ML19317F243 (1)
Forwards AO-287/75-02
ML19317F240
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/19/1975
From: Thies A
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F240 (2)