ML19317F207
| ML19317F207 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/02/1976 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Goller K Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19317F208 | List: |
| References | |
| NUDOCS 8001080922 | |
| Download: ML19317F207 (1) | |
Text
_
a.
. g --
y g p
A9 JUN 0 21976 r
Karl R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors SAFETY EVALUATION OF Pl0 POSED TE0iNICAL SPECIFICATION CHANGE FOR OCONEE UNIT 3 PLANT NAME: Oc Unit 3 DOCKET NUPBER:
RESPONSIBLE BRAN PROJECT MANAGER: ORB-1, Gary Zech REVIEW BRANOi: Reactor Safety REVIEW STATUS:
Complete The Duke Power Company ahs proposed deletion of the 10,944 effective full power hour limitation on Oconee Unit 3 from the Technical Specifications.
The staff has reviewed and approved the deletion based upon the proper use of an approved analysis for cladding collapse times.
The safety evaluation of this proposed change is sunmarized in the enclosure.
Darrell G. Eisenhut, Assistant Director for Operational Technology Division of Operating Reactors
Enclosure:
As stated cc: 'V. Stello DhSTRIBUTION D. Eisenhut Docket Files (50-287)
R. Baer NRR Rdg.
G. Zech RSB Rdg.
C. Berlinger S. Weiss Plant File FCoffman S. Kim
~;-
y R. Player F. Coffhan 5
'7#U' m
~
.=
8001089
,.. : 3_.
.,L-i
^
, si /
, DOR:RSBN DDR b T DOR:RSS FCdffmi:ct fyaer DEisenhut J>
5/Afr/76 y /
/76~--- 5/ 2 / 75
~
O ATE M
__.i_
~
, Fose ABC 31s (Rev. 9 55) AacM 02#
k u. tee---
N N 7"7,
,.,he m.
~_.
[u..
,;