ML19317F197
| ML19317F197 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/17/1975 |
| From: | Maccary R Office of Nuclear Reactor Regulation |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001080911 | |
| Download: ML19317F197 (1) | |
Text
.. _ _.
f c..
.T
~.;
NOV 171975 Distribution:
Docket No. 50-237 Docket N'o. 50-387 NRR-Rdg SEB-Rdg Karl R. Go11er, Assistant Director for Operating Reactors Division of Reactor Licensing EVALUATION REPORT (TAR-1865) OCONEE UNIT 3 INCREASE IN SPENT FUEL CAPACITY Plant: Oconee Nuclear Station Docket Number:
50-287 Licensing Stage: Post OL Branch Requesting Assistance: ORS 1 Pmject Manager: Gary G. Zech Description of Request:
Review mquest and determine if proposed modifications are acceptable In accordance with your mquest, the Structural Engineering Branch, Division of Technical Review, has reviewed the structural aspects of the subject material.
The applicant has made a detailed seismic design analysis of his proposed new storage racks using appropriate codes and floor response spectra. The results fmm this analysis have been combined with those from other suitable loadings and cowared against acceptable allowable stress levels and deflection criteria.
It is considered that the procedures used and results achieved show that the rack as currently desi.,ned is acceptable.
R. R. Maccary, Assistant Director for Engineering Division of Technical Review cc:
R. Boyd, RL
- 6. Zech, RL W. Mcdonald, MIPC M. Xehnemuyi, TR D. Eisenhut, NRR R. Giardina TR R. Heineman, TR L. Shao, TR S. Varga, RL I. Sihwe11. TR R. Purple, RL F. Schauer, TR TR:SEB 1 TR:SEB TR:SEB)
TR E
7807-f[4_
M-
-~L M
- ' =
- hauer:mb ISihweil_
LCS R
U-800108 FSc
.u - -
- 11/ /J75 11/ f?L7._5_
11/g/75 11]i[f_75
[_.
Pese ABC.)I8 (Rev. 9 33) A304 0240
- u. s. oovandenesse reassesme errice i,va.ese see
.... ~.
_ _... _..., -.. _. _ _. _. _.. -.. - _.