ML19317F109
| ML19317F109 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/01/1974 |
| From: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Grier B US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001080798 | |
| Download: ML19317F109 (1) | |
Text
___
February 1, 1974 B. H. Grier, Assistant Director for Constmction 6 Operation, PO l
INSPECTICH OF 1ADE POWER 03PN# 50-269/73-12 Your enn-sts on the improper airf1w path ct Oconee 1 does point out a potential deficiency in the existing tecleical specifications.
%e PSAR and the technical specifications at present usus11y do not comprehensively identify the operability requirments for reactor i
Partial ventilation operability facility ventilation syst as.
requirements are sometimes included in specifications concerning refueling, control room iwlation or effluent releases.
l To initiate study and resolution of this matter, we have discussed it with members of the Quality Assurance Branch in Technical Reviw n ey have j
that are preparing standard technical specifications.
j agreed to consider your ennnents and include such specifications as Following are found to be appropriate in the standanl specifications subject, we woula plan to modify existing tecimical specifications in a similar fashion.
Donald J. Skovholt Assistant Director for Operating Reactors j
Directorate of Licensing A. Giambusso, L cc:
J. Hendrie, L R. Tedesco, L R. Vollmer, L Gt Branch Oiiefs T. J. Carter, L D
BIRION entral Files RP Reading IMSkovholt 7%
. R08:Lo
[
. e omes>
1
.;. Sp..DJSko __olt-b
{-
. sunnaw >. 2/1/74 +
2/1/74
.f s
L.-
om >
L........... _
MM*-81e85-t unr47s Wasc.minn.e.ssi AECM 02#
"""1080 7 7 !
p r
..